Coroner's Concerns
The MATTERS OF CONCERN as follows_ (1) Notwithstanding the contribution made to this collision by the condition of the tyres of Ford Ka this is the second Inquest have conducted within the past 12 months into the death of a driver who lost control of their vehicle on the same section of the A46. (2)The speed Iimit in the section of the A46 known as the 'Hartley Bends' should be reviewed and reduced s0 as to improve the safety of drivers as they approach these bends_ (3) The road signs including carriageway markings should be reviewed and improved so as to provide greater warning to drivers as to the severity of the approaching bends: (4) Consideration be given to the provision of 'rumble strips' in advance of the bends so as to further encourage the reduction in the speed of vehicles as they approach the bends_
Responses
Response received
View full response
Dear Dr Harrowing, Thank you for your letter of 28 April 2014, addressed to Graham Dalton, about the inquest into the death of Miss Yasmin Mary Richards and specifically the recommendations made under regulations 28 and 29 of The Coroners (Investigations) Regulations 2013. am replying while Mr Dalton is away the office In responding to your recommendations, shall set out the considerable improvement work that has been done on the A46 at this location since 2 November In addition shall detail the future intended actions together with timeline that the Highways Agency intend to pursue_ take this further opportunity to extend our sympathies to Miss Richards' family following this tragic incident: The safety of the travelling public is priority for us and any incident; particularly one as serious as this_ is regrettable and a cause for concern_ On that basis we continuously monitor our entire network in terms of its condition and safety profile and where appropriate develop engineering solutions_ In 2010/11 we received the A46 Route Safety Study that covered the entire A46 route from M4 Junction 18 into Bath. This report recommended safety improvements to different sections of the route It acknowledged that in the locality of the Hartley Bends the accidents that occurred were indicative of higher speeds than road conditions would dictate, but recommended that given the short length of road involved, rather than simply apply another short change in posted speed, potentially causing confusion, driver frustration and resulting non-compliance, it would be more effective to use more overt visual methods to improve information for drivers on the hazards are approaching in order that drivve appropriately. This recommendation was accepted and, following development of business case, this safety scheme was included in our forward programme for implementation in early
2014. The salient proposals in the Hartley Bends locality were as follows: INVESTORS An executive agency of the IMPFOPLF Denartment for Transnort Flax from May they they
Interactive vehicle activated signs (VAS) to be installed on the north and southbound approaches to Hartley Bends: These signs visually are activated by high speed and advise drivers to slow down and of the geometric hazards ahead; Introduction of high friction surface (HFS) material that will visually highlight the road's geometry and provide improved road holding for vehicles; Additional hatching to provide separation between opposing traffic streams_ (NB this was later deleted from the proposal after evidence emerged that the area to be hatched was consistently overrun and could present danger to powered two wheelers (PTW); The provision of yellow backing boards to augment the existing 50 mph signs (NB following discussions with the local Area of Outstanding Natural Beauty (AONB) Board these were removed in favour of the use of larger roundels to achieve the same improvement with reduced environmental impact): As previously stated, these works were programmed for early 2014 and therefore after November 2013_ However , following 2 November, we took the additional precaution of providing temporary advisory 30 mph signing while we looked into accelerating future road surface renewal works, over and above the planned safety scheme. am pleased to say that the road resurfacing and the majority of the safety scheme were completed in this year. The exception is the VAS signs that have been installed but not switched on, primarily due to construction issues but also to allow us to collect 'before' and after' speed information to determine their effectiveness and inform future decisions In section 5(3) of your report you make reference to 'rumble strips'. believe you are referring to yellow bar markings as used on the approaches to roundabouts These are not considered suitable for use on single carriageway roads as need to be laid verge to verge in order for their extremities not to cause hazard to oncoming vehicles and if used on bends such as the A46 can reduce traction for vehicles_ There are also adverse environmental effects such as increased noise_ However, high friction surfacing (HFS) can, and has_ laid in strips primarily for increased longevity of the material and improved vehicle traction: This also results in a similar rumble impact for drivers that believe you envisaged_ trust you consider the above satisfies points 3 and 4 of section 5 of your report: In reviewing the 2011 report still consider that the now implemented local measures to highlight the nature of the road are logical and proactive steps, which may positively affect speeds without the need: for revised posted limit; As regards recommendation 2 f Section 5 we proposed the following future actions: peer review by one of our other service providers not connected with this locality or the original piece of work. This is expected to be completed by the end of July 2014. May they been your
2 The gathering of data to ascertain the effectiveness of the now implemented safety scheme together with reasonable period of accident monitoring to gauge impact; and if required, further intervention development: In this case one year would seem appropriate. Additionally we have been in contact with Avon and Somerset Police regarding their support of the imposition of potential reduction in speed in this locality should monitoring and review of the new works indicate that it should be re-considered_ The Police have indicated that they would not oppose such proposal but confirm that it would not be routinely enforced. The Agency takes its responsibilities seriously in terms of road safety and the competing needs and requirements of our customers. trust that on this occasion you consider the tangible improvements we have already made since November, together with the commitment to continue to assess the situation, are in accordance with your recommendations
2014. The salient proposals in the Hartley Bends locality were as follows: INVESTORS An executive agency of the IMPFOPLF Denartment for Transnort Flax from May they they
Interactive vehicle activated signs (VAS) to be installed on the north and southbound approaches to Hartley Bends: These signs visually are activated by high speed and advise drivers to slow down and of the geometric hazards ahead; Introduction of high friction surface (HFS) material that will visually highlight the road's geometry and provide improved road holding for vehicles; Additional hatching to provide separation between opposing traffic streams_ (NB this was later deleted from the proposal after evidence emerged that the area to be hatched was consistently overrun and could present danger to powered two wheelers (PTW); The provision of yellow backing boards to augment the existing 50 mph signs (NB following discussions with the local Area of Outstanding Natural Beauty (AONB) Board these were removed in favour of the use of larger roundels to achieve the same improvement with reduced environmental impact): As previously stated, these works were programmed for early 2014 and therefore after November 2013_ However , following 2 November, we took the additional precaution of providing temporary advisory 30 mph signing while we looked into accelerating future road surface renewal works, over and above the planned safety scheme. am pleased to say that the road resurfacing and the majority of the safety scheme were completed in this year. The exception is the VAS signs that have been installed but not switched on, primarily due to construction issues but also to allow us to collect 'before' and after' speed information to determine their effectiveness and inform future decisions In section 5(3) of your report you make reference to 'rumble strips'. believe you are referring to yellow bar markings as used on the approaches to roundabouts These are not considered suitable for use on single carriageway roads as need to be laid verge to verge in order for their extremities not to cause hazard to oncoming vehicles and if used on bends such as the A46 can reduce traction for vehicles_ There are also adverse environmental effects such as increased noise_ However, high friction surfacing (HFS) can, and has_ laid in strips primarily for increased longevity of the material and improved vehicle traction: This also results in a similar rumble impact for drivers that believe you envisaged_ trust you consider the above satisfies points 3 and 4 of section 5 of your report: In reviewing the 2011 report still consider that the now implemented local measures to highlight the nature of the road are logical and proactive steps, which may positively affect speeds without the need: for revised posted limit; As regards recommendation 2 f Section 5 we proposed the following future actions: peer review by one of our other service providers not connected with this locality or the original piece of work. This is expected to be completed by the end of July 2014. May they been your
2 The gathering of data to ascertain the effectiveness of the now implemented safety scheme together with reasonable period of accident monitoring to gauge impact; and if required, further intervention development: In this case one year would seem appropriate. Additionally we have been in contact with Avon and Somerset Police regarding their support of the imposition of potential reduction in speed in this locality should monitoring and review of the new works indicate that it should be re-considered_ The Police have indicated that they would not oppose such proposal but confirm that it would not be routinely enforced. The Agency takes its responsibilities seriously in terms of road safety and the competing needs and requirements of our customers. trust that on this occasion you consider the tangible improvements we have already made since November, together with the commitment to continue to assess the situation, are in accordance with your recommendations
Action Should Be Taken
In my opinion action should be taken to prevent future deaths and believe your organisation has the power to take such action:
Report Sections
Investigation and Inquest
On 8th November 2013 commenced an investigation into the death of Miss Yasmin Richards age 21 years The investigation concluded at the end of the inquest on 20th March 2014 The conclusion of the inquest was that the medical cause of death was I(a) Chest injuries the short-form conclusion was that the death was due a 'Road Traffic Collision'_
Circumstances of the Death
The circumstances of Miss Richard's death was that on Znd November 2013 she was driving her Ford Kal south along the A46 between Nimlet and Bath_ She was alone in the car at the time As she was negotiating a left hand bend in the section of the A46 known as the 'Hartley Bends' she lost control of her vehicle and crossed over into the the opposing carriageway: At the same time a Range Rover was travelling in the opposite direction and was unable to avoid the oncoming Ford Ka; collision occurred between the two vehicles and as a result of the collision Miss Richard'$ received injuries from which died at the scene_ She was pronounced dead at 10.00 hours, The driver of the Range Rover was physically uninjured. During the Inquest heard evidence from witnesses to the collision as well as from
Similar PFD Reports
Reports sharing organisations, categories, or themes with this PFD
Related Inquiry Recommendations
Public inquiry recommendations addressing similar themes
Revise signal sighting standard to explicitly consider signal readability
Ladbroke Grove Inquiry
Hazardous road design
Define additional time required for reading gantry-mounted and complex signals
Ladbroke Grove Inquiry
Hazardous road design
Clarify "very short duration" definition within the signal sighting standard
Ladbroke Grove Inquiry
Hazardous road design
Identify and retrospectively review locations affected by "very short duration" ambiguity
Ladbroke Grove Inquiry
Hazardous road design
Clarify "overhead line equipment" in signal sighting standard to mean wires and droppers
Ladbroke Grove Inquiry
Hazardous road design
Define acceptable limits for temporary signal obscuration in sighting standards
Ladbroke Grove Inquiry
Hazardous road design
Explicitly define cab sight lines for signal positioning based on driver's eye
Ladbroke Grove Inquiry
Hazardous road design
Railtrack to conduct safety examination of Paddington station layout and operations.
Ladbroke Grove Inquiry
Hazardous road design