Sasha-Raven Marie Brown
PFD Report
Historic (No Identified Response)
Ref: 2022-0057
No published response · Over 2 years old
Sent To
Response Status
Responses
0 of 1
56-Day Deadline
15 Apr 2022
Over 2 years old — no identified published response
About PFD responses
Organisations named in PFD reports must respond within 56 days explaining what actions they are taking.
Source: Courts and Tribunals Judiciary
Coroner’s Concerns
It is acknowledged that officers of the Highway Authority were not called to give evidence at the Inquest Hearing nor was the Authority designated as an Interested Person for the purposes of disclosure and participation at the Hearing. There had been a written Report Collision ref 01 -21 however from the Authority received at the Hearing OFFICIAL SENSITIVE
-
relating to the roadway being the “A6068 Come Road between Carr Head Lane and New Hall Farm near Cowling/Crosshills, Craven District” However the evidence revealed: a) The particular stretch of the A6068 was known to local, and other motorists familiar with it, as being frequently incapable of adequately and safely clearing surface storm and rainwater off the carriageway surface, thereby to make the road as reasonably safe as possible for the passage of motor vehicles, especially those travelling down the incline (as was the deceased). b) That water flowed and flows rapidly down the incline. It was (and is) is not adequately regulated by drains and did not (and does not) get away. Instead water which came off (and comes off) adjacent land as well as the road itself accumulated (and accumulates) in volume. The want of appropriate cambers and slopes across the carriageway allowed (and allows) and indeed encouraged (and encourages) the water flow across the whole of the carriageway, rather than be conducted along drainage channels to the sides of the carriageway. c) The profile of the roadway meant (and means) that the water was (and is likely to be) thrown back (and forth) across the carriageway The evidence showed a heavy water flow spread right across the carriageway into the deceased’s path from the deceased’s offside to nearside. That had been from an accumulation of water after there was a flow nearside to offside a short distance back from the incident scene. d) The process of simply cleaning out drains was not (and has not been) adequate to minimise the risk to road users. The evidence pointed to the need to make significant permanent road engineering alterations to the camber, layout, profile and slopes of the road surface and drains. The evidence indicated that the high levels of traversing water were not rare occurrences, creating what was found to be a ‘notoriety’. Climate change will increase the likelihood of adverse incidents such as was evidenced happening in the future, causing increased risk of death. The roadway here will remain a high risk, as it was for the deceased, for fatal accidents. e) There were (and are) no signs/signage indicating the risk of the road ‘flooding’, whether temporary or permanent at this location. Those familiar with it, including the Police expert, knew it for the past and present risk of loss of control. That should not mean the risk can be acceptable. f) The Authority must consider promptly permanent road engineering solutions and implement those appropriate to make this road as safe as reasonably possible.
-
relating to the roadway being the “A6068 Come Road between Carr Head Lane and New Hall Farm near Cowling/Crosshills, Craven District” However the evidence revealed: a) The particular stretch of the A6068 was known to local, and other motorists familiar with it, as being frequently incapable of adequately and safely clearing surface storm and rainwater off the carriageway surface, thereby to make the road as reasonably safe as possible for the passage of motor vehicles, especially those travelling down the incline (as was the deceased). b) That water flowed and flows rapidly down the incline. It was (and is) is not adequately regulated by drains and did not (and does not) get away. Instead water which came off (and comes off) adjacent land as well as the road itself accumulated (and accumulates) in volume. The want of appropriate cambers and slopes across the carriageway allowed (and allows) and indeed encouraged (and encourages) the water flow across the whole of the carriageway, rather than be conducted along drainage channels to the sides of the carriageway. c) The profile of the roadway meant (and means) that the water was (and is likely to be) thrown back (and forth) across the carriageway The evidence showed a heavy water flow spread right across the carriageway into the deceased’s path from the deceased’s offside to nearside. That had been from an accumulation of water after there was a flow nearside to offside a short distance back from the incident scene. d) The process of simply cleaning out drains was not (and has not been) adequate to minimise the risk to road users. The evidence pointed to the need to make significant permanent road engineering alterations to the camber, layout, profile and slopes of the road surface and drains. The evidence indicated that the high levels of traversing water were not rare occurrences, creating what was found to be a ‘notoriety’. Climate change will increase the likelihood of adverse incidents such as was evidenced happening in the future, causing increased risk of death. The roadway here will remain a high risk, as it was for the deceased, for fatal accidents. e) There were (and are) no signs/signage indicating the risk of the road ‘flooding’, whether temporary or permanent at this location. Those familiar with it, including the Police expert, knew it for the past and present risk of loss of control. That should not mean the risk can be acceptable. f) The Authority must consider promptly permanent road engineering solutions and implement those appropriate to make this road as safe as reasonably possible.
Report Sections
Investigation and Inquest
On 21 January 2021 an investigation commenced into the death of Sasha-Raven Marie Brown aged 21 years. The investigation concluded at the end of the inquest on 16 February 2022, The conclusion of the inquest was that Miss Brown died because of multiple major injuries due to a Road Traffic Collision. A formal Conclusion of Road Traffic Collision was recorded.
Circumstances of the Death
On 19 January 2021 Miss Brown was the unaccompanied driver of a motor car on the A6068 between Cowling and Glusburn travelling down an incline where the road surface was very wet due to heavy falls of rain. She lost control of the vehicle in the wet conditions and came into collision with an oncoming car. She suffered serious injuries in that collision from which she was recognised as deceased there at 12.49 hours that same afternoon.
Similar PFD Reports
Reports sharing organisations, categories, or themes with this PFD
Related Inquiry Recommendations
Public inquiry recommendations addressing similar themes
Revise signal sighting standard to explicitly consider signal readability
Ladbroke Grove Inquiry
Hazardous road design
Define additional time required for reading gantry-mounted and complex signals
Ladbroke Grove Inquiry
Hazardous road design
Clarify "very short duration" definition within the signal sighting standard
Ladbroke Grove Inquiry
Hazardous road design
Identify and retrospectively review locations affected by "very short duration" ambiguity
Ladbroke Grove Inquiry
Hazardous road design
Clarify "overhead line equipment" in signal sighting standard to mean wires and droppers
Ladbroke Grove Inquiry
Hazardous road design
Define acceptable limits for temporary signal obscuration in sighting standards
Ladbroke Grove Inquiry
Hazardous road design
Explicitly define cab sight lines for signal positioning based on driver's eye
Ladbroke Grove Inquiry
Hazardous road design
Railtrack to conduct safety examination of Paddington station layout and operations.
Ladbroke Grove Inquiry
Hazardous road design
Data sourced from Courts and Tribunals Judiciary under the Open Government Licence.