Recommendation 3: Safety management system content
From The Public Inquiry into the Piper Alpha Disaster, published 12 November 1990.
Recommendation
The SMS should be in respect of (a) the design (both conceptual and detailed) of the operator’s installations; and (b) the procedures (both operational and emergency) of those installations. In the case of existing installations the SMS in respect of design should be directed to its review and upgrading so far as that is reasonably practicable (para 21.56). The SMS should set out the safety objectives, the system by which these objectives are to be achieved, the performance standards which are to be met and the means by which adherence to these standards is to be monitored (para 21.56). It should draw on quality assurance principles similar to those stated in BS 5750 and ISO 9000 (para 21.58).
Government response
No government response to this recommendation is on the record yet.
Delivery
No statement on delivery from the addressee has been found in the sources searched (last checked 27 February 2026). This is separate from the response above.