Scottish Hospitals Inquiry Recommendation SHI-3
4 Mar 2025
Addressed to Scottish Government

It is critical that a health board formulates and then presents its requirements for the key building systems in a proposed healthcare facility (its "brief") in terms which are full, clear, and unambiguous, and that that brief is finalised before a contract is signed and Financial Close is achieved. While development…

2024

Grenfell Tower Inquiry Recommendation P2-23
4 Sep 2024
Addressed to UK Government

Accordingly, we recommend that the same panel consider whether all building control functions should be performed by a national authority. (113.38)

Grenfell Tower Inquiry Recommendation P2-22
4 Sep 2024
Addressed to UK Government

We therefore recommend that the government appoint an independent panel to consider whether it is in the public interest for building control functions to be performed by those who have a commercial interest in the process. (113.37)

Grenfell Tower Inquiry Recommendation P2-21
4 Sep 2024
Addressed to UK Government

We therefore recommend that a licensing scheme operated by the construction regulator be introduced for principal contractors wishing to undertake the construction or refurbishment of higher-risk buildings and that it be a legal requirement that any application for building control approval for the construction or…

Grenfell Tower Inquiry Recommendation P2-20
4 Sep 2024
Addressed to UK Government

We also recommend that it be made a statutory requirement that an application for building control approval in relation to the construction or refurbishment of a higher-risk building (Gateway 2) be supported by a statement from a senior manager of the principal designer under the Building Safety Act 2022 that all…

Grenfell Tower Inquiry Recommendation P2-19
4 Sep 2024
Addressed to ARB/RIBA

We recognise that both the Architects Registration Board and the Royal Institute of British Architects have taken steps since the Grenfell Tower fire to improve the education and training of architects. We recommend that they should review the changes already made to ensure they are sufficient in the light of our…

Grenfell Tower Inquiry Recommendation P2-18
4 Sep 2024
Addressed to UK Government

We also recommend that the government, working in collaboration with industry and professional bodies, encourage the development of courses in the principles of fire engineering for construction professionals and members of the fire and rescue services as part of their continuing professional development. (113.28)

Grenfell Tower Inquiry Recommendation P2-17
4 Sep 2024
Addressed to UK Government

The development and maintenance of a statement of professional skills should ultimately be the responsibility of the body that regulates the profession, but pending the establishment of such a body we recommend that the government convene a group of practitioner and academic fire engineers and such other professionals…

Grenfell Tower Inquiry Recommendation P2-16
4 Sep 2024
Addressed to UK Government

In order to speed up the creation of a body of professional fire engineers we also recommend that the government take urgent steps to increase the number of places on high-quality masters level courses in fire engineering accredited by the professional regulator. (113.25)

Grenfell Tower Inquiry Recommendation P2-15
4 Sep 2024
Addressed to UK Government

We therefore recommend that the profession of fire engineer be recognised and protected by law and that an independent body be established to regulate the profession, define the standards required for membership, maintain a register of members and regulate their conduct. (113.25)

Grenfell Tower Inquiry Recommendation P2-13
4 Sep 2024
Addressed to UK Government

We therefore recommend that the construction regulator should be responsible for assessing the conformity of construction products with the requirements of legislation, statutory guidance and industry standards and issuing certificates as appropriate. We should expect such certificates to become pre-eminent in the…

Grenfell Tower Inquiry Recommendation P2-12
4 Sep 2024
Addressed to UK Government

For the reasons given by Professor [name] we think that BS 9414 should be approached with caution and we recommend that the government make it clear that it should not be used as a substitute for an assessment by a suitably qualified fire engineer. (113.18)

Grenfell Tower Inquiry Recommendation P2-10
4 Sep 2024
Addressed to UK Government

We therefore recommend that it be made a statutory requirement that a fire safety strategy produced by a registered fire engineer (see below) to be submitted with building control applications (at Gateway 2) for the construction or refurbishment of any higher-risk building and for it to be reviewed and re-submitted at…

Grenfell Tower Inquiry Recommendation P2-9
4 Sep 2024
Addressed to UK Government

We therefore recommend that, as far as possible, membership of bodies advising on changes to the statutory guidance should include representatives of the academic community as well as those with practical experience of the industry (including fire engineers) chosen for their experience and skill and should extend…

Grenfell Tower Inquiry Recommendation P2-7
4 Sep 2024
Addressed to UK Government

New materials and methods of construction and the practice of overcladding existing buildings make the existence of effective compartmentation a questionable assumption and we recommend that it be reconsidered when Approved Document B is revised. (113.13)

Grenfell Tower Inquiry Recommendation P2-6
4 Sep 2024
Addressed to UK Government

We therefore recommend that a revised version of the guidance contain a clear warning in each section that the legal requirements are contained in the Building Regulations and that compliance with the guidance will not necessarily result in compliance with them. (113.12)

Grenfell Tower Inquiry Recommendation P2-5
4 Sep 2024
Addressed to UK Government

We therefore recommend that the statutory guidance generally, and Approved Document B in particular, be reviewed accordingly and a revised version published as soon as possible. (113.11)

Grenfell Tower Inquiry Recommendation P2-4
4 Sep 2024
Addressed to UK Government

We therefore recommend that the Secretary of State appoint a Chief Construction Adviser with a sufficient budget and staff to provide advice on all matters affecting the construction industry, including: a) monitoring all aspects of the department's work relating to the Building Regulations and statutory guidance; b)…

Grenfell Tower Inquiry Recommendation P2-3
4 Sep 2024
Addressed to UK Government

We therefore recommend that the government bring responsibility for the functions relating to fire safety currently exercised by MHCLG, the Home Office and the Department for Business and Trade into one department under a single Secretary of State. (113.8)

Grenfell Tower Inquiry Recommendation P2-2
4 Sep 2024
Addressed to UK Government

We therefore recommend that the definition of a higher-risk building for the purposes of the Building Safety Act be reviewed urgently. (113.7)

Grenfell Tower Inquiry Recommendation P2-1
4 Sep 2024
Addressed to UK Government

We therefore recommend that the government draw together under a single regulator all the functions relating to the construction industry to which we have referred. (113.6)

1988

Fennell Inquiry Recommendation FENN-136
10 Nov 1988

The designs for new stations or significant alterations to stations shall be scrutinised by the fire authority and the Railway Inspectorate with special regard to passenger safety and fire precautions.

Fennell Inquiry Recommendation FENN-135
10 Nov 1988

The 'Department of Transport Railway Construction and Operation Requirements' in respect of underground railways and stations shall be reviewed, together with the letter dated 10 November 1958 to the railway undertakings entitled 'Submission of new works for approval by the Minister under S.41(1) of the Road and Rail…

1986

Popplewell Inquiry Recommendation POPP-C.10
16 Jan 1986
Addressed to Department of the Environment

The Department of the Environment should urgently amend the Building Regulations Guidance Codes in relation to structural fire precautions in new stands.

1968

Ronan Point Inquiry Recommendation RONA-45
6 Nov 1968

Code of Practice 3: Chapter V: Loading, must, as a matter of urgency, be brought up to date and should take account of recent research into the frequency and duration of high winds particularly on high buildings (paragraph 214).