Inquiries / Themes / Transport
Rail industry structure and performance
Fragmentation, capacity, reform, network planning.
18 inquiry recommendations
Public inquiry recommendations
What public inquiries recommended · 18 recommendations
2000
Development of ATP should be managed and funded in future through a System Authority having broad industry representation and support (para 15.13).
Future R&D must be the subject of rigorous programming, cost-projections and funding arrangements, including reliable contingencies. R&D funding must be on a cross-industry basis, irrespective of whether individual TOCs decide to fit new technology (para 16.22).
One or more System Authorities should be created to oversee the specific development of any new project on the railways and to oversee continuation of work on existing projects, including AWS and ATP (paras 15.13, 16.13, 16.18).
S&SD together with HMRI and other bodies having responsibility for accepting or approving new equipment or stock should review their procedures with a view to reducing delay and introducing fast-track procedures where possible (para 15.7).
Consideration should also be given, for the purpose of the above recommendations, to enlarging or re-organising existing inter-company groups, including considering whether the Railway Group should include ROSCOs and component suppliers (para 16.20).
The above recommendation to include review of Safety Cases and franchising arrangements and consideration of action by the Rail Regulator (para 16.22).
Rights (including ownership) and obligations in all equipment added to vehicles, together with lineside equipment upon which its operation depends, must be defined in legally enforceable terms (paras 15.7, 15.13, 16.21).
Steps should be taken to put in place means to resolve inter-company issues relating to research and development at all levels. Specifically, the following issues must be addressed (paras 15.13, 16.21).
More Level 2 and 3 Policy Statements should be introduced having due regard to any relevant risk analysis (para 6.16).
Railtrack should review their Level 1 Policy Statement in the light of any amendment to Condition H11 (para 6.16).
There should be a review of Condition H11 of the Track Access Conditions which should make clear that no regulating decision is to be made on the basis of protecting commercial interests. Safety and security must be paramount considerations (paras 4.13, 7.6, 16.16).
Railtrack must ensure that Rules and Group Standards applicable to operators, including drivers, are clear and unambiguous. In particular, Railtrack should urgently complete the review of operating Rules to ensure they are workable in the privatised, fragmented industry (para 16.6).
1989
BR shall ensure that the organisational framework exists to prevent commercial considerations of a business-led railway from compromising safety.
BR shall develop an adequate system of allocating priority to projects to ensure that safety standards are not compromised by delay.
The Department of Transport and BRB shall make a thorough study of appraisal procedure for safety elements of investment proposals so that the cost-effectiveness of safe operation of the railway occupies its proper place in a business-led operation.
BR shall require that any future reorganisation shall be properly planned, effectively resourced and implemented to an agreed timetable which takes account of all relevant problems.
1988
Funds allocated to London Underground must be fully used, and particular attention paid to the safety implications of any changes to the budget.
The numbers of passengers using the system must be duly reflected in the criteria for investment appraisal in London Underground.