Start construction by 2024 on an early scheme piloting standardised hospital design.

Conclusion
DHSC must quickly complete and test its standardised hospital design to avert further delays to hospital construction, and to reduce the current high risk of cost and quality issues in years to come. DHSC has taken too long to get its Hospital 2.0 design off the drawing board. It continues to be optimistic that the design and a related new commercial model will reduce future construction costs by 25% and could even reduce the total time taken to develop new hospitals from 11 years to six. Yet, until the design is complete and has been tested, these claims are at risk of being just pipe dreams. Unlike Denmark’s programme for building ‘super hospitals’, DHSC has not allowed time for proper piloting of its new standard hospital. Failure to pilot thoroughly could store up problems for future generations because of defective or poorly thought through standardisation. The New Hospital Programme 7 Recommendation 4: For the twin purposes of piloting and making progress, DHSC should aim to be ready to start construction during 2024 of at least one early scheme that uses its standardised hospital design, with a particular focus on trialling new clinical infrastructure such as standardised operating theatres.
Government Response

A response document is linked to this report, dated 8 March 2024. Response attribution to this conclusion has not been verified. Read the response document.

Addressee Bodies
HM Treasury
Timeline
Recommendation age 2.8 yrs
Report published 17 Nov 2023