New Hospital Programme's cost and time saving estimates for standard design are very ambitious.

Conclusion
DHSC aims to improve the cost-effectiveness and quality of new hospitals by standardising hospital design, including the business case process, and making increased use of modern methods of construction.19 Many traditional hospital construction schemes suffered from cost overruns and delays, which the NHP team believes it can reduce through a more centralised, modern approach. But NHP’s estimates of the level of savings that can be made are very ambitious. It has previously said that schemes that fully adopt its new approach would cost 25% less and take 20% less time to build than under traditional design and construction approaches. Then, at our evidence session in September, DHSC was more optimistic regarding time savings, telling us the model would reduce the total time taken to develop new hospitals from an average of 11 years to about six. This would amount to a time saving of some 40%, twice as much as was estimated earlier in 2023.20
Government Response

A response document is linked to this report, dated 8 March 2024. Response attribution to this conclusion has not been verified. Read the response document.

Addressee Bodies
HM Treasury
Timeline
Recommendation age 2.8 yrs
Report published 17 Nov 2023