DHSC remains reluctant to conduct rigorous real-life testing of the Hospital 2.0 design.
Conclusion
More generally, we asked DHSC whether it should commit to first building one hospital according to Hospital 2.0 designs in order to discover its viability in practice, the true scope for cost and time savings, and problems and snags that could be removed, before the design is repeated across multiple schemes. DHSC seemed reluctant to accept the desirability of rigorous real-life testing, replying generically that it was always looking for opportunities to accelerate the programme.26
Government Response
A response document is linked to this report, dated 8 March 2024. Response attribution to this conclusion has not been verified. Read the response document.