Reports & recommendations

93 recommendations, each with the government response on the record. Filter by government response or delivery status.

Title Volume Publication Date Recommendations Links
Southall Rail Accident Inquiry Report — Professor John Uff
Original Uff final report. Exact publication day stated by HSC in its separate February 2002 progress document; Railways Archive wrapper also says 24 February 2000. Wrapper 311 versus native 312 physical pages; retain native count.
- 24 Feb 2000 93
Southall Rail Accident Inquiry Report — Summary of Progress at February 2002
Separate HSC progress report: reporting period February 2002; printed April 2002, month precision only. Publication day unknown, date remains NULL.
- - 0

Recommendations (93)

1

Co-operate on research into driver behaviour

Recommendation
All parties in the rail industry should co-operate in the collection of evidence to support reliable research into human behaviour studies relating to driver performance. Railtrack should co-ordinate this work and TOCs incorporate the results into training programmes (paras 1.25, …
2

Evidence from CIRAS and on-train data recorders

Recommendation

Evidence should include that to be provided by CIRAS and from On-Train Data Recorders used to monitor driver behaviour. ASLEF in particular should give their full support to such an initiative (paras 14.23, 14.25, 15.15, 16.3).

3

Simulators for driver training

Recommendation

Simulators should be introduced for driver training and for the observance of driver behaviour (para 16.3).

4

Driver training in abnormal situations

Recommendation

Driver training should include driving in abnormal situations permitted by the Rules and specifically driving with AWS isolated to the extent so permitted, including the use of simulators (para 16.4).

5

Testing of driver competence and knowledge of the Rules

Recommendation

Testing of driver competence and knowledge of Rules should be extended to cover application of the Rules to practical situations, including all abnormal driving situations permitted by the Rules (para 16.4).

6

Encourage drivers to report faults

Recommendation

Drivers should be encouraged to report all actual or suspected faults, whether through formal fault reporting procedures or through CIRAS (paras 14.26, 16.4).

7

National qualification and accreditation system for drivers

Recommendation

Railtrack together with ATOC should establish a national qualification and accreditation system for drivers including centrally held records to be available to the current employer (paras 5.5, 16.5).

8

Monitor driver transfers and numbers trained

Recommendation

Railtrack and ATOC should monitor the transfer of drivers between operators and the numbers of drivers trained by each TOC and consider whether there are any safety implications involved (paras 5.5, 16.5).

9

Review of drivers' working hours

Recommendation

Current Rules governing drivers’ permitted daily and weekly working hours should be reviewed in the light of current research into human behaviour (para 5.9).

10

Rules and Group Standards clear and unambiguous

Recommendation
Railtrack must ensure that Rules and Group Standards applicable to operators, including drivers, are clear and unambiguous. In particular, Railtrack should urgently complete the review of operating Rules to ensure they are workable in the privatised, fragmented industry (para 16.6).
11

Avoid using several documents for one operational issue

Recommendation

The use of more than one document (whether Rules, Group Standards or otherwise) to cover a single operational issue should be avoided, save where proper reasons exist for use of multiple sources (para 15.9).

12

Designate train-borne safety equipment as vital or not

Recommendation

All train-borne safety equipment should be clearly designated as to whether or not it is vital to the continued running of the train (para 15.11).

13

AWS is vital to the continued running of the train

Recommendation

AWS is to be regarded as vital to the continued running of the train (para 15.11).

14

National procedures on failure of train-borne safety equipment

Recommendation

Clear procedures for steps to be taken on failure of any train-borne safety equipment should apply nationally, subject only to such company variation as is fully justified (para 15.11).

15

Emphasise compliance with the Rule Book

Recommendation

All parties must emphasise the need to comply with the Rule Book and must not condone departures (para 7.9).

16

Drivers and staff to use formal fault reporting

Recommendation
Railtrack and TOCs must impress on drivers and other staff the need to use formal fault reporting procedures where the Rules so provide, and that the duty to report a fault must be performed personally and the report delivered to …
17

Simpler fault reporting procedures

Recommendation

Fault reporting procedures should be reviewed and made as simple and convenient to use as practically possible. They should include provision for an acknowledgement and an explanation if relevant (para 16.11).

18

Failure to provide fault reporting means a disciplinary offence

Recommendation

Failure to provide forms, defect repair books or other means of reporting faults should be regarded as a disciplinary offence (para 16.11).

19

Automatic records of verbal reports in control centres

Recommendation

Appropriate procedures for receiving and making an automatic record of verbal reports should exist in all control centres, similar to the facilities installed by GWT in 1998 (Para 9.14).

20

Training for information controllers

Recommendation

Level and quality of training for information controllers should be reviewed (para 9.15).

21

Controllers' posts designated safety-critical

Recommendation

Controllers’ posts in Railtrack and TOCs should be designated as “safety-critical” as defined in the Railways (Safety Critical Works) Regulations 1994 (para 9.15).

22

Fault databases to log repeat faults

Recommendation

Fault data bases (including RAVERS) should ensure that repeat faults are logged and that a 28 day history of defects is available to managers and maintenance staff (para 16.9).

23

Databases to highlight trends in reported faults

Recommendation

Databases should be programmed to determine and highlight statistically significant trends in faults reported and to display such information to managers and maintenance staff (para 16.9).

24

GWT records of maintenance staff competencies

Recommendation

GWT should maintain full records of competencies for all maintenance staff as required by job descriptions and safety responsibility statements (paras 6.8, 15.6).

25

GWT to monitor maintenance staff workload

Recommendation

GWT should regularly monitor the workload of all maintenance staff (para 15.6).

26

Detailed examination checklists for maintenance staff

Recommendation

A current and detailed list of items required to be inspected for each examination should be prepared for and used by maintenance teams (paras 6.8, 15.6).

27

A-Exam documentation to require ATP reset and self-test

Recommendation

Documentation for the A-Exam should require ATP reset and self-test (para 6.8).

28

Flow-chart of the sources of repair work

Recommendation

Maintenance staff should be provided with a flow-chart to show the derivation of all sources of repair work, to include RAVERS (with check on repeat items) and appropriate structure for Request, Repair Book and Maintenance Control items (para 15.16).

29

Maintenance to check history of reported defects

Recommendation

Maintenance procedures should require checking of the history of reported defects, including repeat faults, and the taking of appropriate action (paras 6.14, 15.6).

30

Improved AWS test box at all depots

Recommendation

An improved AWS test box, capable of detecting faults not revealed by the magnet test, should be provided as standard issue at all maintenance depots (paras 6.11, 9.22, 15.6).

31

Prevent in-service failure of train-borne safety equipment

Recommendation
Efforts should be concentrated on ensuring that AWS and other train-borne safety equipment does not fail in service through preventable causes. This should include regular replacements of equipment, maintenance of full service records and provision for full traceability of repairable …
32

Ownership and rights in AWS equipment

Recommendation

Contractual ownership and other rights in AWS equipment must be clarified and defined (paras 15.7, 16.21).

33

Monitor supply of new AWS parts

Recommendation

ATOC and Railtrack should monitor the supply of new AWS parts and components to ensure continued availability on an indefinite basis, including the introduction of improved components (para 15.7).

34

Check signal alignment and sighting at commissioning

Recommendation

Railtrack should ensure that the alignment and sighting of signals is confirmed at the time of commissioning, both from the signal and from the track, and appropriate records made, including photographs (paras 3.16, 16.14).

35

Regular checks on signal alignment and sighting

Recommendation

Railtrack should ensure that checks on alignment and sighting of signals are made at least annually, and at a greater frequency to be determined on the basis of errors found (paras 3.16, 16.14).

36

Review maintenance contracts for what checks are covered

Recommendation

Railtrack should review all maintenance contracts to ensure that all parties are aware of what checks are included and which excluded (paras 3.16, 16.14).

37

Risk assessment before any change of regulation policy

Recommendation

Railtrack should ensure that any further proposed change of regulation policy is preceded by a risk assessment (para 4.6, 16.15).

38

Review of Condition H11 of the Track Access Conditions

Recommendation
There should be a review of Condition H11 of the Track Access Conditions which should make clear that no regulating decision is to be made on the basis of protecting commercial interests. Safety and security must be paramount considerations (paras …
39

Review Level 1 Policy Statement

Recommendation

Railtrack should review their Level 1 Policy Statement in the light of any amendment to Condition H11 (para 6.16).

40

More Level 2 and 3 Policy Statements

Recommendation

More Level 2 and 3 Policy Statements should be introduced having due regard to any relevant risk analysis (para 6.16).

41

Review operation of ARS

Recommendation

Railtrack should review the operation of ARS to consider whether more green signals should be booked ahead of higher speed trains, and generally whether the speed and length of trains is adequately taken into account (para 16.16).

42

Take Dr Murphy's risk analysis into account in any LRM review

Recommendation

Any further review of LRM should take into account Dr Murphy’s risk analysis (para 16.16).

43

Long-term review of speed and casualty numbers

Recommendation

HMRI should keep under long-term review the effect of speed on numbers of casualties in rail accidents (para 11.7).

44

Review of internal safety features in passenger vehicles

Recommendation
A review should be carried out by ATOC, with input from all interested bodies, on the ways in which internal safety features may be modified and standardised to provide the best practicable means of emergency exit under accident conditions, including …
45

Dates and means for improving existing stock

Recommendation

The review should consider dates and means for the introduction of identified improvements to existing stock (para 11.2, 15.16).

46

A single body to set interior safety standards

Recommendation

A single body should be empowered to specify common standards for safety features in the interior of passenger vehicles and to identify and approve types of vehicles and/or operators to which particular standards are to apply (paras 11.6, 16.18).

47

Internal doors that open easily in a crash

Recommendation
The design of coaches should be such that internal doors can be easily opened in a crash situation, in darkness and irrespective of the attitude of the vehicle; and that hammers intended for breaking windows can be easily located in …
48

Safety briefings for passengers

Recommendation
Safety briefings or other appropriate means of communicating safety information to passengers should be adopted, including pointing out safety notices to passengers. ATOC should monitor the methods adopted by TOCs and issue guidance documents after a suitable trial period, including …
49

Design study on less aggressive freight wagons

Recommendation

A design study and risk assessment should be carried out to determine whether freight wagons could be designed with less aggressive features without detriment to their primary function (para 11.14).

50

Most appropriate coupling for freight trains

Recommendation

Consideration should be given to the most appropriate form of coupling for freight trains, to minimise damage in the event of collision, including a risk assessment (para 11.15).

51

Crumple zones in passenger carriages

Recommendation

No recommendation is made concerning crumple zones in passenger carriages, save that the matter should be given attention by the Ladbroke Grove Inquiry (para 11.4).

52

Training and briefing for train crews on emergencies

Recommendation

Train crews should be given improved training and briefing on emergency actions, including a practical evacuation (para 11.11).

53

Practical exercises to prove passenger evacuation standards

Recommendation

Standards for evacuation of passengers should be proved by practical exercises using typical groups of passengers and train crew, and repeated on a regular basis to be approved by HMRI (para 11.11).

54

Design of overhead line structures

Recommendation

Consideration should be given to modification to the design of OHL structures to improve their response to accidents, if achievable without detriment to their primary role (para 11.16).

55

Data recorders on all trains

Recommendation

All trains should be fitted with data recorders. All data recorders should record speed, time/location, brake application and AWS cancellation, and should be simple and speedy to download (para 14.23).

56

Cheaper data recorders for retrospective fitment

Recommendation

Consideration should be given to developing a cheaper form of data recorder for retrospective fitment where this will allow earlier fitting (para 14.24).

57

Resolve inter-company research and development issues

Recommendation

Steps should be taken to put in place means to resolve inter-company issues relating to research and development at all levels. Specifically, the following issues must be addressed (paras 15.13, 16.21).

58

Rights and obligations in equipment added to vehicles

Recommendation

Rights (including ownership) and obligations in all equipment added to vehicles, together with lineside equipment upon which its operation depends, must be defined in legally enforceable terms (paras 15.7, 15.13, 16.21).

59

Review of Safety Cases and franchising arrangements

Recommendation

The above recommendation to include review of Safety Cases and franchising arrangements and consideration of action by the Rail Regulator (para 16.22).

60

Enlarge or re-organise inter-company bodies

Recommendation

Consideration should also be given, for the purpose of the above recommendations, to enlarging or re-organising existing inter-company groups, including considering whether the Railway Group should include ROSCOs and component suppliers (para 16.20).

61

Review of acceptance and approval of new equipment or stock

Recommendation

S&SD together with HMRI and other bodies having responsibility for accepting or approving new equipment or stock should review their procedures with a view to reducing delay and introducing fast-track procedures where possible (para 15.7).

62

Review progress on the DTp Review Committee Report

Recommendation

There should be a review of progress on implementing the Recommendations of the DTp Review Committee Report (chaired by Sir David Davies) published in September 1996 (para 14.31).

63

System Authorities to oversee new projects

Recommendation

One or more System Authorities should be created to oversee the specific development of any new project on the railways and to oversee continuation of work on existing projects, including AWS and ATP (paras 15.13, 16.13, 16.18).

64

Rigorous programming and funding of future research and development

Recommendation
Future R&D must be the subject of rigorous programming, cost-projections and funding arrangements, including reliable contingencies. R&D funding must be on a cross-industry basis, irrespective of whether individual TOCs decide to fit new technology (para 16.22).
65

Manage and fund ATP development through a System Authority

Recommendation

Development of ATP should be managed and funded in future through a System Authority having broad industry representation and support (para 15.13).

66

Keep ATP fully operational on Great Western lines

Recommendation

ATP should be maintained in a fully operational state on Great Western lines currently fitted, until replaced by an equally effective train protection system (para 15.14).

67

Consider extending ATP coverage

Recommendation

GWT and Railtrack should consider extensions to the present coverage of ATP (para 15.14).

68

Running with AWS isolated where ATP is fitted

Recommendation

GWT, Railtrack and HMRI should consider whether trains with AWS isolated can run normal services where ATP is fitted and operational (para 15.10).

69

Paper procedures must not become divorced from reality

Recommendation

All parties in the industry must ensure that paper-based procedures do not become divorced from reality. This should include senior managers maintaining a direct knowledge of the situation in railway workplaces (para 16.25).

70

Back paper audits with unplanned inspections

Recommendation

Paper-based audits should be backed up by unplanned inspections and other direct observation of the work under review (para 16.26).

71

Rigorous risk assessments

Recommendation
Steps should be taken to ensure that all risk assessments are rigorous and that those initiating risk assessments are appropriately qualified and informed. Steps include giving attention to HSE Guidance Notes covering risk assessment, which should accordingly be kept under …
72

Consultation on Group Standards

Recommendation

Consultation procedures and times involved in revision of Group Standards or the introduction of new Group Standards, should be reviewed by the Inquiry to be held into safety procedures (para 16.8).

73

HMRI to control technical investigation of serious accidents

Recommendation

The technical investigation of serious rail accidents should be controlled by HMRI save in exceptional cases of suspected crime which is unconnected with the running of the railway (para 15.23).

74

A single definitive technical investigation

Recommendation
HMRI should ensure that a single, thorough and definitive technical investigation is carried out, to include the recording of all appropriate factual data, the collection of physical evidence from the scene of the accident and decisions as to handing the …
75

Standing contracts for railway experts

Recommendation
Standing contracts for the provision of consulting services by recognised railway experts should be amended to make provision for HMRI to require any appropriate individual to provide expert services for the immediate accident investigation, including the services of any appropriate …
76

HMRI to decide what data passes to rail companies

Recommendation

HMRI should decide, irrespective of any ongoing criminal investigation, what data or information is to be passed on to rail companies for rapid action (para 15.24).

77

Rail Industry Inquiry as the forum for recommendations

Recommendation
The primary forum for deciding upon appropriate recommendations following an accident should be the Rail Industry Inquiry (RII). Procedures for holding such an inquiry at the earliest possible date should be strengthened, and should include the presentation by HMRI of …
78

Review procedure for Rail Industry Inquiries

Recommendation

Procedure for conducting a RII should be reviewed. This should include ensuring that the RII panel is independent of all parties having an interest in the accident (paras 9.33, 15.25, 16.26).

79

Make Rail Industry Inquiries accessible to the public

Recommendation

Consideration should be given to whether procedures can be adapted to make any RII accessible to the public, save where the needs of confidentiality otherwise require (para 15.28).

80

No delay to opening or reporting of an inquiry

Recommendation

Nothing should be permitted to delay the opening of a RII nor the completion of their Report and Recommendations (para 15.28).

81

An additional independent accident investigation body

Recommendation

Consideration should be given to whether an additional independent accident investigation body should be created, to take over the accident investigation functions of HMRI under Recommendation 73 (para 15.23).

82

Review protocols between Railtrack, BTP and HMRI

Recommendation

Existing protocols between Railtrack, BTP and HMRI should be reviewed in the light of the above Recommendations (para 15.24).

83

Later inquiries under the Health and Safety at Work Act

Recommendation
Any subsequent Inquiry directed under the Health and Safety at Work Act, 1974 should involve all parties in the rail industry who may have an interest in Recommendations to be made, through the involvement of representative groups including ATOC (para …
84

Passenger representation at inquiries

Recommendation
Passenger representation at such inquiries should not be limited to those involved in the immediate accident. Consideration should be given to enlarging the role of CRUCC and the provision of appropriate funding for their full participation in Inquiries (para 15.27).
85

Responses to the S&SD paper on accident investigation

Recommendation

Responses to the S&SD paper “The Future of Accident Investigation in the Railway Industry” should be taken into consideration in applying the foregoing Recommendations (para 15.29).

86

Upgrade the role of Rail Incident Officer

Recommendation
Steps should be taken to upgrade the role of Rail Incident Officer and to ensure that the person so designated has sufficient authority and standing for the task in hand, bearing in mind the tensions that can develop in the …
87

Faster earthing and isolation of traction current

Recommendation

Consideration should be given to means of speeding up the process of earthing and isolation of traction current following an accident on an electrified section of line (para 2.15).

88

Evacuation routes that avoid distressing scenes

Recommendation

Routes for evacuation away from an accident should take into account the need to avoid distressing scenes (para 2.11).

89

Sensitive handling of persons rescued from accidents

Recommendation

Further consideration should be given to the sensitive handling of persons rescued from accidents including whether they should be sent onward by train (para 2.14).

90

Liaison with hospital and casualty gathering areas

Recommendation

More effective means of liaising with hospital and casualty gathering areas should be considered (para 2.14).

91

Faster identification of victims and release of information

Recommendation

Identification of victims should be speeded up and information released to relatives at the earliest possible time (para 2.24).

92

Casualty bureaux procedures

Recommendation

Casualty bureaux procedures should be reviewed in order to ensure that they remain open for as long as required and that adequate telephone facilities are available (para 2.24).

93

Post-accident de-briefing procedures

Recommendation

Post-accident de-briefing procedures should be reviewed to ensure that combined de-briefings are held between all involved Railway Industry and Emergency Services groups (paras 2.25, 16.28).