PFD Report All Responded Ref: 2020-0259
Date of Report 13 July 2020
Coroner Caroline Beasley-Murray
Coroner Area Essex
Response Deadline est. 24 February 2021
All 1 response received · Deadline: 24 Feb 2021
Response Status
Responses 1 of 1
56-Day Deadline 24 Feb 2021
All responses received
About PFD responses

Organisations named in PFD reports must respond within 56 days explaining what actions they are taking.

Source: Courts and Tribunals Judiciary

Coroner’s Concerns
The BTP post incident site report reported the following:-
1. No crisis signs at the location
2. Relatively easy access over the footbridge parapet and sides. It is my understanding that point 1. has been remedied but not point 2. The family of the deceased has photographs of the location which can be sent on to you.
Responses
Essex Highways
25 Aug 2020
Response received
View full response
Dear Mrs Beasley-Murray,

Re: Regulation 28 Report to Prevent Future Deaths – Mr L C Ramos Dos Anjos

I am writing to update you regarding St Dominic Road Footbridge, Colchester following our initial letter to you dated 25 August 2020

Following the concerns you raised within item five of your report, I can confirm that your recommendations have been explored further and our inspection report has been finalised. As a result of our option study, we can confirm that we identified three potential options of improvement for the structure:

- Option One To install an enclosed mesh canopy to the entire footbridge
- Option Two To install a solid screen extension to the top of the existing bridge parapet
- Option Three Installation of full height panels resulting in corrugated steel parapets

Our preferred option is option three. Our initial investigations suggest that this option provides more durability to the structure, along with providing preventative measures to reduce the possibilities of further incidents occurring in the future at this location. Engineers within my team also believe that option three will provide better value for money for Essex County Council and furthermore, option three will result in the least impact upon the existing structural capacity of the footbridge. Sent By E-Mail

Mrs C Beasley-Murray Essex Coroner's Service, Essex County Council, County Hall, Market Road, Chelmsford, CM1 1QH

13 November 2020

Our Ref:

The bridge now needs to undergo a full structural assessment and this is estimated to be completed by the end of January 2021. Once the bridge has undergone a full engineering assessment, the design of any refurbishment works can commence. The design is estimated to take approximately twelve weeks to complete, should no additional strengthening works be necessary.

Please note, if it is agreed to provide these works the chosen option must be agreed by Network Rail, as the footbridge travels over the train line and is extremely close to overhead cables. Once designed, the works are likely to last an estimated six weeks to complete.

I trust that the above information is useful however please contact me should you have any further concerns. Once the structural assessment has been completed, we will endeavour to provide you with a further update.
Report Sections
Investigation and Inquest
On 8 November 2019 I commenced an investigation into the death of Luiz Claudio Ramos Dos Anjos (jnr) a 21 year old man who died on 7 November 2019 at on the railway track at St Dominic’s footbridge Colchester.

The conclusion of the inquest was:- the deceased killed himself whilst suffering from a diagnosed mental illness. The deceased had a substantial history of mental illness stretching back over a number of years.
Circumstances of the Death
See above

The medical cause of death was 1a) multiple traumatic injuries 1b) train collision.
Copies Sent To
British Transport Police
Related Inquiry Recommendations

Public inquiry recommendations addressing similar themes

Replace Buried Metallic LPG Pipes
ICL Inquiry
Public Infrastructure Physical Hazards
New LPG Safety Regime
ICL Inquiry
Public Infrastructure Physical Hazards
LPG Supplier Registration
ICL Inquiry
Public Infrastructure Physical Hazards
Polyethylene Piping Research
ICL Inquiry
Public Infrastructure Physical Hazards
Limit perimeter fencing height to a maximum of 2.2 metres
Taylor Inquiry
Public Infrastructure Physical Hazards
Paint and mark all emergency gates in fences with "Emergency Exit
Taylor Inquiry
Public Infrastructure Physical Hazards
Keep all perimeter fence gates to pitch unlocked and open during matches
Taylor Inquiry
Public Infrastructure Physical Hazards
Annually inspect all crush barriers for corrosion; repair or replace as needed
Taylor Inquiry
Public Infrastructure Physical Hazards

Data sourced from Courts and Tribunals Judiciary under the Open Government Licence.