Miriam Boulia

PFD Report All Responded Ref: 2022-0383
Date of Report 28 November 2022
Coroner Adam Smith
Response Deadline est. 23 January 2023
All 2 responses received · Deadline: 23 Jan 2023
Response Status
Responses 2 of 1
56-Day Deadline 23 Jan 2023
All responses received
About PFD responses

Organisations named in PFD reports must respond within 56 days explaining what actions they are taking.

Source: Courts and Tribunals Judiciary

Coroner’s Concerns
I received evidence, both in the form of a report and orally in court, from PC , a Traffic Management Officer in the Road Safety Engineering Unit of the Metropolitan Police. He is a qualified Highway Inspector recognised by the Institute of Highway Engineers and holds a RoSPA certificate in Road Safety, Collision Investigation and Prevention. As part of preparing his report, he conducted two site visits, when he observed the operation of the signals at the crossings at this junction and the behaviour of pedestrians.

The current timings of the signals, both at the pedestrian crossing where Ms Boulia died (at the North West side of Curtain Road, which I refer to as crossing 1) and the crossing over Great Eastern Street at the South East side of Curtain Road (by the Old Blue Last pub, which I refer to as crossing 2) do not allow enough time for pedestrians to cross the road safely.

The inter-green period (the period when the road traffic’s signals are not at green) at crossing 1 is only 10 seconds, made up of 6 seconds when the pedestrian signal is at green man and 4 seconds of “blackout” or “clearance” period. 10 seconds is insufficient time to allow pedestrians to cross the road safely before the road traffic’s signals change to green. The green man for pedestrians is an invitation to cross, hence the blackout period should allow enough time for any pedestrians who step onto the crossing a moment before the green man goes out to cross the road safely. The current blackout period does not allow for this.

Although at crossing 1, the 10 second inter-green period extends to 16 seconds when there is no road traffic filtering from Curtain Road to Great Eastern Street, in practice this is rarely the case. There is no filtering traffic at crossing 2, but the inter-green period is still insufficient to allow pedestrians to cross safely.

PC observed that pedestrians routinely cross on the red man at the crossings at the junction of Great Eastern Street and Curtain Road, probably due to the inadequate inter-green periods.

There have been 21 collisions involving injury at this junction over a recent three-year period, 9 of those involving injury to pedestrians. Of particular concern is that the number of collisions at this junction of a similar nature to that in which Ms Boulia died, is unusually high.

I also received a report from TfL, from which I note that this junction will now formally be included within TfL’s recently re-instituted Safer Junctions Programme (it previously was not part of the programme). However, the report indicated that the timescale for completion of any improvements to this junction is 2-4 years, subject to funding.

The TfL report indicated that any urgent safety improvements which need to be made at this junction in advance of progressing the wider scheme will be progressed, and that a site visit was being arranged for early December 2022 to consider any urgent safety improvements.

PC gave evidence that improvements to signal timings (including increasing the inter-green periods) can be made much quicker than installation of new signals (such as signals including countdown timers). I understand that such changes could be made much quicker than the 2-4 years envisaged for completion of the wider scheme.

I consider that changes to the signal timings would amount to urgent safety improvements.
Responses
Transport for London report
21 Nov 2022
Transport for London's pre-inquest report outlined a proposed Safer Junction scheme for Great Eastern Street and stated that modernisation to pedestrian signals and consideration of cycle early release would be part of this scheme. TfL was arranging a site visit to consider proposals from the Metropolitan Police Service. AI summary
View full response
INQUEST TOUCHING ON THE DEATH OF MIRIAM BOULIA – 21 NOVEMBER 2022 REPORT BY TRANSPORT FOR LONDON Introduction
1. Transport for London (‘TfL’) would like to express its sincere condolences to the family and friends of Miriam Boulia following her tragic death on 4 February 2022 at the junction at Great Eastern Street/Curtain Road in the LB Hackney.

2. This report is written to assist the Coroner’s investigation into Ms Boulia’s death which is listed to take place on Monday 21 November 2022 at Poplar Coroner’s Court.

3. The report covers:

a) TfL’s proposed Safer Junction scheme at Great Eastern Street/Shoreditch High Street/Commercial Street , which incorporates the Road Safety scheme at the junction at Great Eastern Street/Curtain Road; b) Go Ahead London site visit following the collision; and c) Response to the report from the MPS’s Traffic Management Officer.

(a) TfL’s proposed Safer Junction scheme at Great Eastern Street/Shoreditch High Street/Commercial Street , which incorporates the Road Safety scheme at the junction at Great Eastern Street/Curtain Road

4. TfL, as the highway authority, has responsibility for maintaining, operating and improving the Transport for London Road Network (‘TLRN’) in London. The TLRN comprises around 5% of all roads in London, but carries over one third of all traffic.

5. The Mayor of London’s Transport Strategy1 was published in 2018 and sets out a clear commitment to the Vision Zero approach to eliminating road deaths and serious injuries on London’s roads. The Mayor, through TfL and the boroughs, and working with stakeholders, has adopted Vision Zero for road danger in London and the aim is for no one to be killed in or by a London bus by 2030 and for all deaths and serious injuries from road collisions to be eliminated from London’s streets by 2041.

6. The Mayor, TfL and the Metropolitan Police Service (‘MPS’) have published London’s first Vision Zero action plan which sets out these bold and ambitious plans to eliminate deaths and serious injuries from London’s transport network.2 Actions in the plan include:

a. Lower speed limits on the TLRN;
b. Transforming dangerous junctions;
c. Tough safety standards for the design of HGVs;
d. A world-leading Bus Safety Standard; and
e. Safer streets for walking.

1 https://www.london.gov.uk/programmes-strategies/transport/our-vision-transport/mayors-transport- strategy-2018 2 https://content.tfl.gov.uk/vision-zero-action-plan.pdf

Safer junctions programme
7. Safety improvements at specific junctions are critical to achieving the Mayor’s Vision Zero ambition in reducing road danger.

8. In April 2017, TfL named 73 junctions to be targeted in its updated Safer Junctions programme.3 TfL’s analysis used the previous three years of casualty figures on the TLRN to identify the junctions with the poorest safety records so that they could be targeted for work. The list of junctions included: (i) 21 junctions which had had significant improvements made within the preceding three years, (ii) 33 junctions with improvements planned within TfL’s business plan and (iii) 19 junctions which would undergo new safety studies to identify possible solutions and safety improvements.

9. The junctions in the Safer Junction programme are also major locations of social interaction and in many cases perform an important ‘place’ function. Therefore design proposals seek to make these locations more appealing to pedestrians and cyclists with the aim of reducing road danger. This holistic approach strives to not only reduce collisions, but improve the urban realm, encourage modal shift to walking and cycling and contribute to wider regeneration objectives.

10. Examples of interventions which can be considered for the Safer Junction programme include:

a. New and/or improved pedestrian crossings;
b. Innovative facilities to separate cyclists from traffic in time and space and improvements to existing cycle facilities where they exist;
c. Wider pedestrian footways and decluttering of existing footways;
d. ‘Floating’ bus stops;
e. Opportunities to introduce sustainable urban drainage;
f. Opportunities to introduce pocket parks, improved hard and soft landscaping and new cycle parking;
g. Reviews of street lighting throughout the scheme area to identify any sub- standard locations;
h. Measures to reduce traffic speeds (including consideration of 20mph) and ensuring those speed reductions are self-enforcing e.g. through raised pedestrian crossings;
i. Measures to bring about traffic reduction through junctions e.g. traffic lane removal (where practicable and without significant adverse impacts on buses) and making roads accessible to pedestrians, cyclists and buses only; and
j. Opportunities for increased bus priority.

11. The junction at Great Eastern Street/Shoreditch High Street/Commercial Street in LB Hackney was one of the 33 junctions announced in April 2017 for which there were planned improvements within TfL’s then business plan and which would be designed to address safety concerns.

3 https://tfl.gov.uk/info-for/media/press-releases/2017/april/new-roads-targeted-in-updated-safer- junctions-programme

Junction at Great Eastern Street/Shoreditch High Street/Commercial Street
12. The junction of Shoreditch High Street and Great Eastern Street, within the LB of Hackney, is situated along the A10 corridor. The A10 is a strategic arterial corridor that runs from Gracechurch Street in central London northwards towards the GLA boundary. Within the LB Hackney, the A10 is generally a single carriageway bi- directional and one way road (with stretches of bus lanes in most sections). Cycle Superhighway 1 also runs closely along most sections of the length of the A10 in LB Hackney and provides cyclists with an unsegregated cycle route on quieter parallel roads.

13. The junction has a mixture of local businesses including a pub on the south-western corner of the junction and a new proposed development on the south-eastern corner. At the junction, there are examples where the street infrastructure acts as a physical barrier to the movement of people. Generally, the junction is dominated by vehicular traffic. However, in the peak periods there is a heavy cycle flow which has no provision. There are also narrow footways adjacent to crossing points, street clutter and relatively high levels of pedestrian flows in this area. In 2017, a 20mph speed limit was introduced around the Shoreditch Triangle.

14. Following a period of work undertaking assessments and surveys, TfL appointed Traffic Design Engineering (‘TDE’) (TfL’s in-house designers) at the end of 2019 to carry out feasibility and concept design for the junction at Great Eastern Street/Shoreditch High Street/Commercial Street. The scope of the commission was for TDE to:

a. Provide feasibility design options based on potential interventions to reduce road danger, including exploring opportunities to improve cycle facilities, encourage pedestrian priority, reduce traffic dominance and vehicle speeds and, where possible, introduce urban realm improvements and/or green infrastructure;
b. Provide concept design of the preferred option;
c. Utilise the results from the base Healthy Streets surveys undertaken by TDE to inform the design;
d. Assist the TfL sponsor to assess the impact of proposals using TfL’s City Planner strategic assessment framework tool;
e. Provide designs to TfL Network Performance to allow them to undertake traffic modelling of recommended solutions for the design of all options and to assess local impacts;
f. Provide technical input to the sponsor for the business case and other required paperwork in preparation for associated programme and portfolio boards;
g. Calculate potential collision savings and other quantifiable benefits which may be derived, such as more walking and cycling; and
h. Provide a detailed Microsoft project programme and cost estimate for TDE tasks related to carrying out the feasibility and concept designs.

15. The map below shows the geographic scope of the feasibility and concept design for this junction:

16. As noted in paragraph 11 above, the junction at Great Eastern Street/Shoreditch High Street/Commercial Street was part of the Safer Junctions programme. TDE were instructed to investigate and provide feasibility and concept designs which could include a combination of various proposals for different parts of the junction at Great Eastern Street/Shoreditch High Street/Commercial Street. The original timescales for the Safer Junction programme for this junction was for feasibility, concept design and consultation to be completed by November 2021. Detailed design was due for completion by the end of October 2022 and construction complete by April 2023. These timescales were not achieved due to the Covid-19 pandemic (see paragraphs 19-20 below).

17. The junction at Great Eastern Street/Curtain Road, the site of the collision involving Ms Boulia on 4 February 2022, was not formally part of the Safer Junction programme. However, as part of the scope of the brief sent to TDE at the end of 2019, TDE was instructed to consider some proposals for this junction as well including reviewing pedestrian crossing facilities at the junction at Great Eastern Street/Curtain Road to incorporate a separate Road Safety scheme to be considered as part of the wider Safer Junction scheme.

18. The brief identified that vehicles travelling east along Great Eastern Street turn into Curtain Road using a left turn slip. Some vehicles then take an immediate right turn into New Inn Yard which directly conflicts with pedestrians. The crossings are narrow and not on the pedestrian desire line. One proposal put forward to TDE was a new

layout for this junction. This would seek to align and widen pedestrian crossings to the desire line and implement physical measures to slow speeds around this junction.

Impact of the Covid-19 pandemic
19. The onset of the Covid-19 pandemic in early 2020 and the national lockdown in March 2020 led to TfL bringing to a halt all project sites unless they needed to continue for operational safety reasons.

20. The pandemic devastated TfL’s fares income which meant TfL required emergency Government support to run its transport services. This has been in the form of several short term-agreements with Government. This led to pausing expenditure on non- critical spend for certain projects. Until TfL secured a long-term funding deal, it was vital to keep expenditure controls under continuous review. Therefore the proposals referred to above to investigate feasibility proposals for the junction at Great Eastern Street/Curtain Road, as well as the wider Safer Junction scheme, were also paused pending a long-term funding deal.

Current proposals for this junction
21. On 30 August 2022, TfL reached a long-term agreement with the Government on funding until 31 March 2024. This has allowed TfL to recommence feasibility and design proposals for various schemes which were paused due to funding constraints during the pandemic.

22. Since August 2022, TfL has been meeting with the Department for Transport (‘DfT’) to discuss plans on spending the funding. TfL will now be progressing the scheme for the Safer Junction programme at Great Eastern Street/Shoreditch High Street/Commercial Street. As part of this, TfL will formally include the Great Eastern Street/Curtain Road junction within the scope of this scheme, subject to final approvals with the DfT. The scope of any briefing for the scheme will include asking the designers to consider the best options for pedestrians at this junction. The timescales for this scheme are 2-4 years, subject to funding.

This junction is a high priority for TfL and any urgent safety improvements which need to be made at this junction in advance of progressing the wider scheme will be progressed (see paragraph 39 for further detail).

(b) Go Ahead London site visit following the collision
23. Go Ahead London is the operator of the bus which was involved in the tragic collision involving Ms Boulia. On 8 February 2022, a site visit was undertaken attended by representatives from Go Ahead London and TfL. After the collision, a Go Ahead London Accident Prevention Manager completed a ‘TfL – Buses Investigation of Major Incident Form’.

24. The form identified potential steps to be taken by the operator and TfL to reduce the likelihood of a recurrence of this type of collision. In terms of TfL, the report stated:

‘It is likely that AEB (Advanced Emergency Braking) may have reduced the level of injury sustained by the pedestrian.

The implementation of ISA would have prevented the driver from exceeding the speed limit. This may have reduced the level of injury sustained by the pedestrian.

Consider returning fencing to guide pedestrians at crossing points. TfL to instigate speed calming measures on this stretch of road to address the observations noted during the site visit.

Bus frontal design – Bus safety standard.’

25. Advanced Emergency Braking (‘AEB’) is a driver assist system which is intended to help the driver avoid or mitigate the severity of collisions. AEB uses forward looking sensors to detect the likelihood of a collision. If the driver has not acted to prevent a detected collision, the brakes are automatically applied to slow, or ideally stop, the vehicle before impact.

26. AEB is a requirement from 2024 for all new buses as part of the Bus Safety Standard Roadmap.4 There is also further information available about the Bus Safety Standard5 and AEB.6

27. Changes to the geometry and energy absorbing materials at the front end of buses are also a requirement in the Bus Safety Standard Roadmap. This safety measure is aimed at better protecting and lessening the severity of an injury suffered by a road user involved in a collision with a bus. Research has been published on this matter and further work is underway to support the delivery of this requirement.7

28. AEB and changes to the front end of buses are designed to work together to optimise their overall effectiveness.

29. Intelligent Speed Assistance (‘ISA’) has been required on all new buses since 2019 through the Bus Safety Standard. TfL have also enabled a slightly different version of ISA on some of its existing fleet and 1,200 buses have been retrofitted to date. Further retrofitting of 1,800 buses is subject to available funding. Currently around 30% of the London bus fleet has ISA. TfL has published some initial research into ISA.8

30. The steps identified by Go Ahead London also referred to the prior removal of fencing at crossing points encouraging pedestrians to cross at locations where sight lines are not optimum. The pedestrian guardrail (‘PGR’) at this location would have been removed over ten years ago as part of a wider programme to remove such infrastructure across the TRLN unless there was a safety case for retention.

31. Consideration of restoring PGR to this junction will be considered as part of the wider scheme for this junction referred to above.

4 https://content.tfl.gov.uk/future-roadmap.pdf 5 https://content.tfl.gov.uk/bus-safety-standard-executive-summary.pdf 6 https://content.tfl.gov.uk/advanced-emergency-braking.pdf 7 https://content.tfl.gov.uk/bus-safety-standard-vru-front-crashworthiness.pdf 8 https://content.tfl.gov.uk/intelligent-speed-assistance-on-london-buses.pdf

32. In terms of instigating traffic calming measures on this stretch of road, such matters will also be considered as part of the wider scheme for this junction. TfL also reviews the speeds of vehicles on roads where speed limits have been changed. If speeds are not reducing or are not at the speed limit level, consideration can then be given to the use of physical measures to aid speed reduction. The most recent survey for Great Eastern Street shows a reduction in speed to 21mph which is within the category, below 24mph, that the DfT states signage and road markings can be used and that physical measures are not also required. We will undertake further surveys as part of the work highlighted in paragraph 22 to consider again if physical measures are required.

33. TfL Surface Transport also completed a form recording some of the details of the collision which is annexed to this report as Annex 1.

(c) Response to report from the MPS’s Traffic Management Officer
34. On 31 October 2022, TfL were provided with a copy of a report by PC Luke Heming, a Traffic Management Officer at the MPS. The report considers the tragic collision involving Ms Boulia and outlines practicable measures that could be implemented to help prevent collisions of this type reoccurring at the location.

35. The conclusion on page 9 of the report proposes some changes which could be made to the junction to improve safety:

a. Potential improvements to the signal timings;
b. Installing new pedestrian signals which include countdowns; and
c. Potential early release timings for cyclists.

36. There have not been any changes to the signal timings or pedestrian signals since the collision on 4 February 2022. However, modernisation to the pedestrian signals will be considered as part of the scheme for this junction (see paragraphs 21-23 above)

37. No cycle early release signals have been installed since the collision on 4 February
2022. As per the approach for pedestrian signals, any modernisation of this junction will consider the inclusion of cycle early release as part of the scheme (see paragraphs 21-23 above).

38. TfL was made aware of the proposals in the MPS report on 31 October 2022. TfL is arranging a further site visit for early December 2022 to consider the proposals made in the MPS report and any findings made at the forthcoming inquest. The purpose of this site visit will be for TfL to consider any urgent safety improvements required at this junction.

Transport for London 17 November 2022
Transport for London
2 Feb 2023
Transport for London plans to undertake a design review of the Great Eastern Street/Curtain Road junction, commencing March 2023, to consider dedicated signal stages for pedestrians and cyclists and pedestrian countdowns. They will also review operational timings for all traffic signals in the Shoreditch triangle. AI summary
View full response
Dear Mr Smith

Regulation 28: Prevention of Future Deaths report - Miriam Boulia

I write on behalf of Transport for London (TfL) with regard to the Assistant Coroner’s Prevention of Future Deaths (PFD) report dated 28 November 2022 following the inquest arising from the death of Ms Miriam Boulia.

The inquest took place on 21 November 2022. TfL was not an Interested Person in the inquest, although TfL provided a report to the Assistant Coroner on 17 November 2022 to assist with his investigation.

I note that this PFD report is addressed to TfL as the responsible highway authority for the A1202. TfL’s Commissioner and Chief Customer and Strategy Officer have asked me to write to you. Please accept this letter as TfL’s response to the matters of concern raised in the PFD report dated 28 November 2022. The response also outlines actions already taken and those that TfL intends to take to improve safety along the A1202 in the vicinity of the Great Eastern Street/Curtain Road junction where this tragic collision took place.

I am personally very sorry to hear of the tragic death of Ms Boulia and wish to express my sincere condolences and those of TfL to the family and friends of Ms Boulia.

Response to the PFD report

TfL is the highway authority responsible for the A1202 Great Eastern Street that includes the location of the collision.

Road safety, particularly the reduction of personal injuries, is core to our business at TfL. We actively seek to reduce collisions across the whole of London with initiatives detailed in the Mayor’s Transport Strategy (March 2018) and the Vision Zero Action Plan (July 2018). These policy documents set our vision to eliminate all deaths and serious injuries by 2041, as well as reduce the danger on our road network. These documents outline the important

first stages in a wide-ranging programme of actions that we, as an organisation, are taking now and over the coming years.

TfL provided a report to the Coroner to assist with his investigation (please find attached the report). TfL explained in the report that the proposed Safer Junction scheme at Great Eastern Street/Shoreditch High Street/Commercial Street will incorporate the Road Safety scheme at the junction at Great Eastern Street/Curtain Road. One proposal put forward was a new layout for this junction. This would seek to align and widen pedestrian crossings to the desire line and implement physical measures to slow speeds around this junction.

The original timescales for the Safer Junction scheme incorporating the junction of Great Eastern Street/Curtain Road were for feasibility, concept design and consultation to be completed by November 2021. Detailed design was due for completion by the end of October 2022 and construction complete by April 2023.

The onset of the Covid-19 pandemic in early 2020 and subsequent lockdowns devastated TfL’s fares income and meant TfL required emergency Government support to run its day- to-day transport services. Therefore, the proposals referred to above to investigate feasibility proposals for the junction at Great Eastern Street/Curtain Road, as well as the wider Safer Junction scheme, were paused pending a long-term funding deal.

On 30 August 2022, TfL reached a long-term agreement with the Government on funding until 31 March 2024. This has allowed TfL to recommence feasibility and design proposals for various schemes which were paused due to funding constraints during the pandemic.

TfL will now be progressing the scheme for the Safer Junction scheme at Great Eastern Street/Shoreditch High Street/Commercial Street, with an expected completion date within the 2026/27 financial year. As part of this, TfL have formally included the Great Eastern Street/Curtain Road junction within the scope of this scheme, with final approval granted from the DfT.

The Coroner noted the above timescales for this long-term project in the PFD report and considers that ‘changes to the signal timings would amount to urgent safety improvements’. TfL considers these concerns below.

Clarifications in the PFD report

The PFD report refers to evidence, received both in the form of a report and orally in court, from , a Traffic Management Officer in the Road Safety Engineering Unit of the Metropolitan Police Service. completed two site visits, where he observed the operation of the signals at the crossings at this junction and the behaviour of pedestrians.

The PFD reports states that;

‘The current timings of the signals, both at the pedestrian crossing where Ms Boulia died (at the North West side of Curtain Road), which he refers to as crossing 1) and the crossing over Great Eastern Street at the South East side of Curtain Road (by the Old Blue Last pub), which he refers to as crossing 2) do not allow enough time for pedestrians to cross the road safely.

The inter-green period (the period when the road traffic’s signals are not at green) at crossing 1 is only 10 seconds, made up of 6 seconds when the pedestrian signal is at green man and 4 seconds of “blackout” or “clearance” period. 10 seconds is insufficient time to allow pedestrians to cross the road safely before the road traffic’s signals change to green.

Although at crossing 1, the 10 second inter-green period extends to 16 seconds when there is no road traffic filtering from Curtain Road to Great Eastern Street, in practice this is rarely the case. There is no filtering traffic at crossing 2, but the inter-green period is still insufficient to allow pedestrians to cross safely.

Pedestrians routinely cross on the red man at the crossings at the junction of Great Eastern Street and Curtain Road, probably due to the inadequate inter-green periods.

There have been 21 collisions involving injury at this junction over a recent three-year period, 9 of those involving injury to pedestrians. Of particular concern is that the number of collisions at this junction of a similar nature to that in which Ms Boulia died, is unusually high.’

The PFD report also states that: ‘ gave evidence that improvements to signal timings (including increasing the inter-green periods) can be made much quicker than installation of new signals (such as signals including countdown timers).’

There are some clarifications to make with regard to the timings as stated in the PFD report. With regard to the statement;

‘The current timings of the signals, both at the pedestrian crossing where Ms Boulia died (at the North West side of Curtain Road), referred to as crossing 1) and the crossing over Great Eastern Street at the South East side of Curtain Road (by the Old Blue Last pub), which is referred to as crossing 2) do not allow enough time for pedestrians to cross the road safely.’

I have clarified below the timing periods for both crossing 1 and 2 across Great Eastern Street (as annotated in the map at figure 1) as indicated in the table below.

Period Timing (seconds) identified in PFD report Actual on street timing (seconds) Green man 6 6 Black Out 4 5 All Red 4 5 Starting Amber 2 2 Total Intergreen 10 12

Figure 1

The timings which are operating on street are therefore longer by two seconds than those set out in the PFD report. The timings on street are in accordance with the National Standards as written by the Department for Transport within ‘Traffic Signs Manual Chapter 6 – Traffic Control’. The timings on street have been operating since March 2012.

By way of clarification, the length of the crossing at point 1 is 11.2m. The length of the crossing at point 2 is 11.2m. These lengths produce timings which are in accordance with the DfT and TfL design guidance, based upon the 1.2m/s walking speed.

With regard to the statement:

‘Although at crossing 1, the 10 second inter-green period extends to 16 seconds when there is no road traffic filtering from Curtain Road to Great Eastern Street, in practice this is rarely the case. There is no filtering traffic at crossing 2, but the inter-green period is still insufficient to allow pedestrians to cross safely.’

By way of clarification, the crossings have the same inter-green periods following the Green Figure, irrespective of what vehicle movement follows the pedestrian movement.

Site visits and work to be undertaken

It is our standard practice and part of our wider commitment to Vision Zero to organise a site visit to the location of every fatal incident that occurs on TfL’s road network. This is to identify any issues and actions that can be taken immediately to prevent future loss of life.

In this case the site visit took place on 4 February 2022 and was attended by TfL to inspect the immediate area. The condition of the assets, including the traffic signals, were checked and no defects were found (please find attached the report).

A further site visit took place on 8 December 2022 and was attended by TfL officers, across a number of teams and range of specialisms. This further inspection also considered the

condition of the assets, the traffic signals, and how the junction was functioning, in particular for vulnerable road users including pedestrians. This determined no defects.

At the site visit, checks were made to the operation of the junction and whether all waiting pedestrians could establish themselves onto the crossings safely within the invitation period. Secondly, we observed and confirmed that the safety clearance periods for the crossings and traffic movements were appropriate.

It was observed that a number of pedestrians would cross in gaps against the red signal and therefore a planned review of the operational timings at the junction (see below) will seek to minimise the waiting time for pedestrians as much as practically possible. TfL’s own studies into pedestrian crossing behaviour have shown that compliance with the crossing signals reduces as wait time increases. The wait time at this junction is typical for a major central London junction with similar signal controls (a maximum of 89 seconds and an average of 45 seconds.)

The site visit therefore determined that when observing how people were using the junction, there were opportunities to make improvements for vulnerable road users.

TfL is therefore committed to undertake a design review of the junction to explore if the signal operation can be further improved to provided additional crossing time for pedestrians to cross Great Eastern Street, such as when the left turn from Curtain Road is not demanded by a vehicle. This could also include the addition of pedestrian countdown on all crossing points at the junction. Resources have already been identified and it is anticipated that this will review will commence at the start of March 2023. Given this junction links to other junctions along Great Eastern Street, such a review may take six months or more to complete. For example, if the design review recommended installation of pedestrian countdown signals, these could then be procured and installed after the review.

TfL will also conduct a review of the operational timings for all traffic signals within the Shoreditch triangle, which includes the location of this tragic fatality. The purpose of this review will be to optimise the green times each traffic, cycle or pedestrian movement (otherwise known as a ‘phases’) receives at each junction. The review will also consider how adjacent junctions are coordinated with each other (known as ‘offsets’) and the waiting times between each successive green signal (known as the ‘cycle time’). All of the signals in this network operate an adaptive signal control system, known as ‘SCOOT’ and TfL will review all of the settings for that system with an objective to minimise the pedestrian waiting times as much as reasonably possible. It is anticipated that this will commence at the start of March 2023.

It is anticipated that the Shoreditch Triangle review will run in parallel with, and complement, the signal design review for the junction at Great Eastern Street/Curtain Road which I’ve described above.

Conclusion

This junction is a high priority for TfL and the signal design review will be completed in advance of progressing the wider scheme.

Please do let me know if you require further information on any of the detail in this letter.
Report Sections
Investigation and Inquest
On 11 February 2022, ME Hassell, HM Senior Coroner for Inner North London, commenced an investigation into the death of Miriam Boulia, aged 33 years. The investigation concluded at the end of the inquest on 21 November 2022.

I made a determination of death by road traffic collision.

The medical cause of death was:

1(a) traumatic brain injury
Circumstances of the Death
The collision occurred just before 9am on a Friday. It was a wet day. Ms Boulia was using a pedestrian crossing to cross Great Eastern Street at its junction with Curtain Road. After crossing safely to a pedestrian island, she initially waited there to cross Great Eastern Street, together with a small group of other pedestrians. Several other pedestrians crossed on a red man.

Ms Boulia then walked onto the crossing across Great Eastern Street, on a red man. She appeared to be holding her hood up whilst looking to her left. She was struck by a bus, which was travelling in a South Easterly direction, from her right, on green traffic signals. She fell underneath the bus and was dragged under it until it came to a standstill. As a result, she sustained catastrophic, unsurvivable injuries. She was declared deceased at the scene.

Although the driver of the bus took appropriate evasive action, the collision was unavoidable.
Copies Sent To
Representatives of the bus driver
Related Inquiry Recommendations

Public inquiry recommendations addressing similar themes

Replace Buried Metallic LPG Pipes
ICL Inquiry
Public Infrastructure Physical Hazards
New LPG Safety Regime
ICL Inquiry
Public Infrastructure Physical Hazards
LPG Supplier Registration
ICL Inquiry
Public Infrastructure Physical Hazards
Polyethylene Piping Research
ICL Inquiry
Public Infrastructure Physical Hazards
Limit perimeter fencing height to a maximum of 2.2 metres
Taylor Inquiry
Public Infrastructure Physical Hazards
Paint and mark all emergency gates in fences with "Emergency Exit
Taylor Inquiry
Public Infrastructure Physical Hazards
Keep all perimeter fence gates to pitch unlocked and open during matches
Taylor Inquiry
Public Infrastructure Physical Hazards
Annually inspect all crush barriers for corrosion; repair or replace as needed
Taylor Inquiry
Public Infrastructure Physical Hazards

Data sourced from Courts and Tribunals Judiciary under the Open Government Licence.