Bartholomew Coleman
PFD Report
All Responded
Ref: 2018-0250
All 1 response received
· Deadline: 19 Nov 2018
Coroner's Concerns (AI summary)
The railway line is easily accessible from a bridge with a low wall, showing signs of frequent public use and alcohol consumption, without adequate warning of danger.
View full coroner's concerns
During the inquest evidence was heard that: The likely point at which Mr Coleman accessed the railway line was bridge on Sandecotes Road, Poole, near to his home address_ The bridge has low brick wall separating the pavement from the area adjacent to the railway track: There is trodden through the undergrowth from the wall to the train track; indicating that that this is a route that has been used by others to access this area: I have concerns with regard to the following: Iunderstand children of school age cross the bridge to and from school. There is evidence to suggest that the area has been used by either groups or individuals to consume alcohol: there are discarded drinks containers in the area beyond the bridge and close to the train track: I am concerned that the railway track is easily accessible to members of the public from this bridge: In addition, there appears to be no warning as to the dangers presented by accessing this area.
Responses
Action Planned
Network Rail is planning to apply mitigation measures (wire mesh panels with base plated fence posts fixed to the top of the parapet walls) to further deter access to the track below, with an anticipated completion date of the end of September 2018. They will also erect a warning sign of the dangers presented. (AI summary)
Network Rail is planning to apply mitigation measures (wire mesh panels with base plated fence posts fixed to the top of the parapet walls) to further deter access to the track below, with an anticipated completion date of the end of September 2018. They will also erect a warning sign of the dangers presented. (AI summary)
View full response
Dear Sir Regulation 28 Report Bartholomew Patrick Coleman refer to vour report dated 25 July 2018 sent in accordance with paragraph 7, Schedule 5, of the Coroners and Justice Act 2009 and Regulations 28 and 29 of the Coroners (Investigations) Regulations 2013 in relation to the inquest into the very sad death of Bartholomew Patrick Coleman, who died on 22 January 2018_ Background The bridge that you have identified in your report is masonry arch bridge that supports highway (Sandecotes Road) over a two track railway that runs from London Waterloo to Weymouth, with steep wooded embankments on both the Down and Up-sides The bridge is in an urban area, on the northern edge of Parkstone town_ There is also a well-used public footpath that runs from just north of Parkstone Station, parallel to the Up road along the top of the embankment that then joins Sandecotes Road at the bridge at the northern parapet (low wall): This footpath is currently closed due to retaining wall works on an adjoining property: bungalow and a house both join the Network Rail boundary on the Up-side: Site assessment Following your report, three members of our route staff (Infrastructure Maintenance Delivery Manager, Head of Maintenance and an Asset Engineer (Structures)) attended the site for an inspection and to make an assessment: There is evidence of access achieved by members of the public by scaling wall on the northern parapet on the north side of the bridge, and walking down very steep embankment to the track side. There is evidence of litter, sign of footfall and graffiti: It is likely that Mr Coleman, as assessed in your report; may have used this path to access the track, due to the evidence of access by members of public: An additional access point has also been identified on the southern parapet on the same side of the line, although there is less evidence of its use by members of the public: It is also possible that this path was used by Mr Coleman to access the track On the opposite side of the bridge (the south side where the track runs to Poole and Weymouth), both parapet walls have a chain-link fence topped with barbed-wire, and there is no obvious or visible evidence of access down that side of the embankment: Network Ra' | Infrastructure Limited Registerad Offlce: Network Raill; Znd Floor; One Eversholt Street; London 2DN Registered in England and Wales No. 2904587 www networkrail co.uk the being the NWI
Addressing your concerns Noting your concerns identified in vour report; and following the Network Rail staff site assessment, Network Rail is planning to apply mitigation measures (wire mesh panels with base plated fence posts fixed to the top of the para walls) to the parapet walls to further deter access to the track below: An order has now been placed with Network Rail's framework contractors in respect of these works, with an anticipated completion date of the end of September 2018. Network Rail will also erect a warning sign of the dangers presented and that the land belongs to Network Rail and therefore access beyond is trespass Safety is of paramount importance at Network Rail. It is a core value of our organisation and we strive to continuously reduce risk to passengers or members of the public We want to learn any lessons we can from this very sad death to prevent similar circumstances arising in the future: hope this response provides you with adequate information and assurance that the issues you identified have been considered and addressed. If can be of further assistance, or you would Iike further clarification, please do not hesitate to contact me:
Addressing your concerns Noting your concerns identified in vour report; and following the Network Rail staff site assessment, Network Rail is planning to apply mitigation measures (wire mesh panels with base plated fence posts fixed to the top of the para walls) to the parapet walls to further deter access to the track below: An order has now been placed with Network Rail's framework contractors in respect of these works, with an anticipated completion date of the end of September 2018. Network Rail will also erect a warning sign of the dangers presented and that the land belongs to Network Rail and therefore access beyond is trespass Safety is of paramount importance at Network Rail. It is a core value of our organisation and we strive to continuously reduce risk to passengers or members of the public We want to learn any lessons we can from this very sad death to prevent similar circumstances arising in the future: hope this response provides you with adequate information and assurance that the issues you identified have been considered and addressed. If can be of further assistance, or you would Iike further clarification, please do not hesitate to contact me:
Sent To
- Network Rail
Response Status
Linked responses
1 of 1
56-Day Deadline
19 Nov 2018
All responses received
About PFD responses
Organisations named in PFD reports must respond within 56 days explaining what actions they are taking.
Source: Courts and Tribunals Judiciary
Report Sections
Investigation and Inquest
On the 1st February 2018, an investigation was commenced into the death of Bartholomew Patrick Coleman, who was born on the 12th March 1945. The investigation concluded at the end of the Inquest on the 18th July 2018. The Medical Cause of Death was: Ia Multiple Injuries The conclusion of the Inquest was Bartholomew Patrick Coleman took his own life while the balance of his mind was disturbed.
Circumstances of the Death
On 24th January 2018, Mr Coleman accessed the train track near to his home address: He lay on the track as a train approached. Mr Coleman was struck by the train and died instantly.
Copies Sent To
Coroners Enquiry Co
Similar PFD Reports
Reports sharing organisations, categories, or themes
Related Inquiry Recommendations
Public inquiry recommendations addressing similar themes
Remove all spikes and inward-facing constructions from perimeter and radial fences
Taylor Inquiry
Public Infrastructure Physical Hazards
Limit perimeter fencing height to a maximum of 2.2 metres
Taylor Inquiry
Public Infrastructure Physical Hazards
Provide sufficient 1.1-metre wide gates in perimeter fences for emergency evacuation
Taylor Inquiry
Public Infrastructure Physical Hazards
Paint and mark all emergency gates in fences with "Emergency Exit
Taylor Inquiry
Public Infrastructure Physical Hazards
Keep all perimeter fence gates to pitch unlocked and open during matches
Taylor Inquiry
Public Infrastructure Physical Hazards
Annually inspect all crush barriers for corrosion; repair or replace as needed
Taylor Inquiry
Public Infrastructure Physical Hazards
Data sourced from Courts and Tribunals Judiciary under the Open Government Licence.