34
Inconsistent PAS 9980 fire risk appraisals lead to significant delays and disputes.
Conclusion
Under the PAS 9980 methodology, competent professionals conduct Fire Risk Appraisals of External Walls (FRAEWs) in which they make conclusions about the risk to life posed by a building’s cladding and make proposals about remedial measures to reduce the level of risk to ‘tolerable’,57 The National Fire Chiefs Council (NFCC) told us that the PAS 9980 assessments were resulting in different conclusions according to the individual conducting the assessment, and often conclusions that differed from the wider ‘Fire Risk Assessments’ that they were meant to inform.58 End Our Cladding Scandal (EOCS) told us in written evidence that three years after PAS9980 was introduced, huge inconsistency in the quality of FRAEWs, was causing “endless delays” over work starting due to disputes over the scope of works. At our evidence session, EOCS told us if 15 different fire engineers were to conduct a FRAEW, they would come up with 15 different opinions.59
Government Response
A response document is linked to this report, dated 16 May 2025. Response attribution to this conclusion has not been verified. Read the response document.
Source
Committee
Public Accounts Committee
Report
17th Report - The Remediation of Dangerous Cladding
21 Mar 2025
HC 362
Addressee Bodies
HM Treasury
Timeline
Recommendation age
1.5 yrs
Report published
21 Mar 2025