Reports & recommendations

18 recommendations, each with the government response on the record. Filter by government response or delivery status.

Title Volume Publication Date Recommendations Links
Ronan Point Inquiry — Final Report - 06 Nov 1968 18

Recommendations (18)

RONA-12

Strengthen Ronan Point and make the joints continuous

Recommendation
Ronan Point should be strengthened, in particular by making the joints tougher and more continuous, so that local damage to the load-bearing walls from whatever cause will not lead to progressive collapse; and so that the building is capable of …
RONA-13

Disconnect the gas supply until Ronan Point is strengthened

Recommendation

Until the building has been strengthened the gas supply to it should be disconnected (paragraph 131).

RONA-19

Disconnect gas from tall buildings liable to progressive collapse

Recommendation

Gas supplies should be disconnected from those existing tall buildings, the design of which renders them liable to progressive collapse, until they have been strengthened (paragraph 161).

RONA-20

Statutory notification and inspection of gas appliance installations

Recommendation
In order to reduce the risk of town gas explosions still further, consideration should be given to a statutory requirement, based on the provisions of the London Gas Undertakings (Regulations) Act 1939, that the installation of any gas appliance should …
RONA-21

Improve ventilation in flats in high blocks

Recommendation

Consideration should be given to means of improving ventilation in flats in high blocks (paragraph 172).

RONA-22

Review storage rules for explosive materials in high blocks

Recommendation

The Regulations governing the storage of other potentially explosive materials in high blocks of flats should be reviewed (paragraph 173).

RONA-29

Structural appraisal of all blocks over six storeys

Recommendation
All blocks over six storeys in height should be appraised by a structural engineer who should consider: (a) whether they are susceptible to progressive collapse (paragraph 191); (b) whether they have been designed to resist adequately the maximum wind loadings …
RONA-30

Strengthen blocks judged susceptible and turn off the gas

Recommendation

In blocks that are judged to be susceptible to progressive collapse, measures must be taken to strengthen them to eliminate this risk, and the gas supply should be turned off until this has been done (paragraph 191).

RONA-31

Strengthen blocks weak against wind loads or fire

Recommendation

Blocks which have not been designed to deal adequately with wind loads, or where progressive collapse may too readily be precipitated by fire, should be strengthened (paragraphs 214 and 216).

RONA-32

New blocks to be designed against progressive collapse

Recommendation
Designers of new blocks must design the building so that it is not susceptible to progressive collapse, paying particular attention to introducing continuity at the joints and so disposing the load-bearing walls that alternative paths are provided in the event …
RONA-33

Use recent wind research pending the new loading Code

Recommendation
Until the new wind loading Code is produced, designers should have regard to the results of recent research into the frequency and duration of high wind speeds, when calculating the wind loadings for which the blocks are to be designed …
RONA-34

Allow for fire effects pending new Building Regulations

Recommendation

Until the new Building Regulations dealing with fire precautions are produced, designers should have regard to the possible effects of fire on the structural behaviour of the building as a whole (paragraph 216).

RONA-36

Owners of tall non-system-built blocks to check wind loads

Recommendation
Owners of tall post-war blocks (say over 100 feet high) that are not system-built should inquire into the wind loads for which the blocks were designed and seek professional advice as to the adequacy of their buildings to withstand the …
RONA-43

Building Regulations to cover progressive collapse

Recommendation

The Building Regulations should include provisions dealing with progressive collapse (paragraph 208).

RONA-44

Code of Practice for large concrete panel construction

Recommendation

A Code of Practice applicable specifically to large concrete panel construction should be prepared and published as a matter of urgency (paragraph 210).

RONA-45

Bring Code of Practice 3 Chapter V Loading up to date

Recommendation

Code of Practice 3: Chapter V: Loading, must, as a matter of urgency, be brought up to date and should take account of recent research into the frequency and duration of high winds particularly on high buildings (paragraph 214).

RONA-46

Fire Regulations to cover the effect of heat on the structure

Recommendation

The Fire Regulations should be revised to take account of the effect of heat arising from a domestic fire of normal intensity on the behaviour of the structure as a whole (paragraph 216).

RONA-47

Minister to keep Standards and Codes of Practice up to date

Recommendation
The Minister of Housing and Local Government, who is responsible for the Building Regulations, must accept responsibility for seeing that the British Standards and Codes of Practice referred to in the Regulations are kept up to date, and that new …