Reports & recommendations

104 recommendations from 2 reports, each with the government response on the record. Filter by government response, report, nation or delivery status.

Recommendations (6)

P1-37
Noted

Urgent fire door inspections required

Recommendation

The owner and manager of every residential building containing separate dwellings (whether or not they are high-rise buildings) carry out an urgent inspection of all fire doors to ensure that they comply with applicable legislative standards.

In brief (written by this site)

The Home Office reported in February 2025 that the recommendation was complete following legislative changes (Home Office, Feb 2025). It stated that under the Fire Safety (England) Regulations 2022, responsible persons for multi-occupied residential buildings of 11 metres and above must conduct quarterly checks on fire doors in common parts and annual checks on flat entrance doors (Home Office, Feb 2025). The Ministry of Housing, Communities and Local Government had previously issued advice in January 2020 recommending routine inspections of all fire doors by qualified professionals (Ministry of Housing, Communities and Local Government response, Jan 2020).

UK Government · 21 Jan 2020 Noted
Words of: HM Government (Ministry of Housing, Communities and Local Government), Grenfell Tower Inquiry Phase 1 Report: Government Response, January 2020 (published on GOV.UK 21 January 2020)
Sir Martin recommended that building owners or the responsible persons carry out urgent checks to ensure fire doors complied with current standards. MHCLG has recommended that all fire doors, including their closers, should be routinely checked or inspected by a suitably qualified professional. MHCLG has also issued advice through its independent Expert Panel asking landlords or building owners to communicate with residents to ensure that they are aware of the importance of maintaining the self-closing devices on all fire doors, including flat entrance doors.
Read full response to P1-37 (opens in a new tab)
Building Owners (Primary)
View details of P1-37
P1-40
Noted

Communicate Major Incident declarations to all responders

Recommendation

Each emergency service must communicate the declaration of a Major Incident to all other Category 1 Responders as soon as possible.

In brief (written by this site)

In February 2025, the Home Office reported the recommendation as complete, stating that its requirements were incorporated into the Joint Emergency Services Interoperability Principles Joint Doctrine published in October 2021 (Home Office, Feb 2025). The department added that the revised London Emergency Services Liaison Panel Major Incidents Procedures Manual was published in November 2021, while London Fire Brigade remained in the process of revising its Major Incident Policy to include informing other category 1 responders (Home Office, Feb 2025).

UK Government · 21 Jan 2020 Noted
Words of: HM Government (Ministry of Housing, Communities and Local Government), Grenfell Tower Inquiry Phase 1 Report: Government Response, January 2020 (published on GOV.UK 21 January 2020)
The Phase 1 report includes a series of recommendations designed to improve the communication arrangements between the three emergency services, their respective control rooms and the incident ground. The Home Office is committed to working with the emergency services to improve interoperability when responding to emergencies. To embed joint working, improve shared situational awareness and a joint understanding of risk arrangements, the Home Office is working with the Interoperability Board to revise Joint Doctrine and immediately reinforce what is expected of responder agencies when major incidents are declared.
Read full response to P1-40 (opens in a new tab)
UK Government (Primary)
View details of P1-40
P1-41
Noted

Establish inter-service control room communications

Recommendation

On the declaration of a Major Incident clear lines of communication must be established as soon as possible between the control rooms of the individual emergency services.

In brief (written by this site)

In February 2025, the Home Office reported this recommendation as "complete", stating that provisions for inter-service communication were incorporated into the revised JESIP Joint Doctrine published in October 2021 (Home Office, Feb 2025). The department also noted in February 2025 that London's revised Major Incidents Procedures Manual was published in November 2021, while the London Fire Brigade was in the process of revising its Major Incident Policy to activate tri-service calls (Home Office, Feb 2025).

UK Government · 21 Jan 2020 Noted
Words of: HM Government (Ministry of Housing, Communities and Local Government), Grenfell Tower Inquiry Phase 1 Report: Government Response, January 2020 (published on GOV.UK 21 January 2020)
The Phase 1 report includes a series of recommendations designed to improve the communication arrangements between the three emergency services, their respective control rooms and the incident ground. The Home Office is committed to working with the emergency services to improve interoperability when responding to emergencies. To embed joint working, improve shared situational awareness and a joint understanding of risk arrangements, the Home Office is working with the Interoperability Board to revise Joint Doctrine and immediately reinforce what is expected of responder agencies when major incidents are declared.
Read full response to P1-41 (opens in a new tab)
UK Government (Primary)
View details of P1-41
P1-42
Noted

Designate single point of contact in control rooms

Recommendation

A single point of contact should be designated within each control room to facilitate such communication.

In brief (written by this site)

In February 2025, the Home Office reported that action on this recommendation was complete, explaining that requirements were incorporated into the revised Joint Emergency Services Interoperability Principles Joint Doctrine published in October 2021 (Home Office, Feb 2025). In the same February 2025 update, the department noted that the London Emergency Services Liaison Panel had published an updated Major Incidents Procedures Manual in November 2021, while London Fire Brigade remained in the process of revising its Major Incident Policy (Home Office, Feb 2025).

UK Government · 21 Jan 2020 Noted
Words of: HM Government (Ministry of Housing, Communities and Local Government), Grenfell Tower Inquiry Phase 1 Report: Government Response, January 2020 (published on GOV.UK 21 January 2020)
The Phase 1 report includes a series of recommendations designed to improve the communication arrangements between the three emergency services, their respective control rooms and the incident ground. The Home Office is committed to working with the emergency services to improve interoperability when responding to emergencies. To embed joint working, improve shared situational awareness and a joint understanding of risk arrangements, the Home Office is working with the Interoperability Board to revise Joint Doctrine and immediately reinforce what is expected of responder agencies when major incidents are declared.
Read full response to P1-42 (opens in a new tab)
UK Government (Primary)
View details of P1-42
P1-43
Noted

Use METHANE messages for Major Incidents

Recommendation

A “METHANE” message should be sent as soon as possible by the emergency service declaring a Major Incident.

In brief (written by this site)

The Inquiry recommended sending a METHANE message promptly when declaring a Major Incident. In February 2025, the Home Office reported that the recommendation was complete, noting that relevant provisions were incorporated into the Joint Emergency Services Interoperability Principles (JESIP) Joint Doctrine in October 2021 (Home Office, Feb 2025). The department added that London emergency services published a revised procedures manual addressing the issues in November 2021 (Home Office, Feb 2025). It also stated that London Fire Brigade was in the process of revising its Major Incident Policy to reinforce METHANE messaging (Home Office, Feb 2025).

UK Government · 21 Jan 2020 Noted
Words of: HM Government (Ministry of Housing, Communities and Local Government), Grenfell Tower Inquiry Phase 1 Report: Government Response, January 2020 (published on GOV.UK 21 January 2020)
The Phase 1 report includes a series of recommendations designed to improve the communication arrangements between the three emergency services, their respective control rooms and the incident ground. The Home Office is committed to working with the emergency services to improve interoperability when responding to emergencies. To embed joint working, improve shared situational awareness and a joint understanding of risk arrangements, the Home Office is working with the Interoperability Board to revise Joint Doctrine and immediately reinforce what is expected of responder agencies when major incidents are declared.
Read full response to P1-43 (opens in a new tab)
UK Government (Primary)
View details of P1-43
P1-45
Noted

NPAS helicopter datalink encryption standards

Recommendation

Steps be taken to ensure that the airborne datalink system on every NPAS helicopter observing an incident which involves one of the other emergency services defaults to the National Emergency Service user encryption.

In brief (written by this site)

In February 2025, the Home Office reported the recommendation as complete, stating that the National Police Air Service had mandated refresher training across 43 police forces and that software upgrades enabling airborne data link systems to automatically default to National Emergency Services user encryption had been completed for all operational aircraft (Home Office, Feb 2025). HM Government had previously stated in January 2020 that aircraft were being manually configured at the start of each shift while an automated technology solution was developed (Ministry of Housing, Communities and Local Government response, Jan 2020).

UK Government · 21 Jan 2020 Noted
Words of: HM Government (Ministry of Housing, Communities and Local Government), Grenfell Tower Inquiry Phase 1 Report: Government Response, January 2020 (published on GOV.UK 21 January 2020)
The Chair recommended steps be taken to ensure airborne data systems on every National Police Air Service (NPAS) aircraft observing an incident which involves one of the other emergency services defaults to the National Emergency Service User encryption. NPAS aircraft are equipped with imagery systems which capture and transmit images to receivers on the ground. These images are encrypted for security purposes. NPAS have completed refreshed training to ensure that all Tactical Flight Officers and pilots are up to date and competent with the encryption systems. Since December 2019, all NPAS aircraft are now manually set at the beginning of …
Read full response to P1-45 (opens in a new tab)
UK Government (Primary)