Reginald Smith

PFD Report All Responded Ref: 2025-0037
Date of Report 21 January 2025
Coroner Richard Middleton
Coroner Area Dorset
Response Deadline est. 18 March 2025
All 2 responses received · Deadline: 18 Mar 2025
Coroner's Concerns (AI summary)
A potentially deformed surgical jig, lacking quality control and auditing, may have caused incorrect hip screw insertion, compounded by the loss of the defective jig preventing proper investigation.
View full coroner's concerns
1) During the inquest evidence was heard that: i) Evidence was given to suggest there were two probable reasons for the hip screw not correctly passing into the nail: firstly, before the femoral nail and jig were inserted it may be that the jig was loose and needed tightening or secondly, the jig used might have been slightly bent
2) I have concerns with regard to the following: i) Each jig is used many times in surgery having been sterilised after each procedure. It is hammered into the thigh bone and on this occasion may have become deformed over time. ii) The jig was sent away to the manufacturer for analysis but was lost and so no information was available to the court in relation to its integrity. iii) There is no quality control in place in relation to the examination of the jigs being used (other than when it is assembled in theatre by a nurse) prior to surgery. There is no auditing/ spot checks in relation to the integrity of the jigs.
Responses
Stryker UK Ltd
26 Mar 2025
Disputed
Stryker disputes that the Gamma Nail Distal Targeting System could become deformed with repeated use if properly maintained. They assert the incident rate for adverse events is extremely rare and their risk mitigation is sufficient. (AI summary)
View full response
Dear Mr. Middleton, Re: Regulation 28 Report, REF: 35392141 I write in response to the Regulation 28 Report to Prevent Future Deaths dated 21 January 2025, REF: 35392141, issued by the Coroner for the County of Dorset (“the Report”). Stryker UK Ltd (“Stryker”) has taken the opportunity to carefully review the Report, investigated the reported adverse event and considered the Matters for Concern which were raised therein. The following outlines Stryker’s position and response to the concerns identified. I. Use of the Gamma Nail Distal Targeting System Concern Raised: Each jig is used many times in surgery having been sterilized after each procedure. It is hammered into the thigh bone and on this occasion may have become deformed over time. Stryker’s Response: The Distal Targeting System (“Targeting System”) is an instrument designed to assist healthcare professionals in the precise application and implantation of compatible Stryker implants, such as the Long Gamma Nail. The instrument should only ever be used by licensed healthcare professionals who are qualified by appropriate training methods and are fully familiar with the instruments intended use and all the applicable surgical techniques. The Targeting System is specifically designed and intended for repeated use. Its major components are comprised of carbon fiber composite material, ensuring high strength, durability, resistance to deformation and long-term structural integrity. When the instrument is cleaned, sterilized and maintained according to the Instructions for Cleaning, Sterilization, Inspection and Maintenance (“Maintenance Instructions”), it remains undamaged and retains its shape, and its serviceable lifespan is not affected. Importantly and contrary to the concern raised, the Targeting System is not hammered into place. The Operative Technique (“OT”) explicitly states that the instrument itself is not designed to be struck and notes that the insertion of the Long Gamma Nail into the femoral canal should progress smoothly, without excessive force. The only instance where a force may be applied is if dense bone is encountered and sufficient reaming has already been confirmed. In such instances, a specific strike plate is attached to the Nail Holding Screw component of the instrument and a designated slotted hammer may be used, with caution. Striking the Targeting System directly is against protocol, and the OT, Instructions for Use (“IFU”) and Maintenance Instructions all warn that hammering the instrument may result in damage or breakage, rendering it unsuitable for further use. The OT, IFU and Maintenance Instructions require the healthcare professional to ensure and verify that all components function correctly with each other and are free from damage. The Maintenance Instructions provide

clear directions for performing a functional check, stating that if any failure or damage is detected, the instrument must be replaced and must not be used as it may have reached the end of its serviceable life. Additionally, the OT and IFU emphasize that throughout the procedure, the instrumentation must be repeatedly checked to ensure correct angles, optimal alignment and secure connections between the implant and the instrument, to allow for proper and precise positioning and fixation of the implant. The Targeting System is designed for durability and proper function when used as intended. The provided guidelines clearly outline correct handling, maintenance, and functional checks to prevent the device from being used in the unlikely event it has been damaged. This ensures the Targeting System remains fit for purpose when used according to the provided guidance.

II. Location of the Distal Targeting System The following concern was raised: The jig was sent away to the manufacturer for analysis but was lost and so no information was available to the court in relation to its integrity. Stryker’s response: Stryker confirms that the Targeting System has not been returned to the manufacturer for analysis. Immediately upon notification of the adverse event, Stryker initiated a Product Investigation (ref: PI 3492425) and coordinated with the hospital for collection of the instrument. Stryker was informed that the Kit containing the Targeting System was placed in the trauma loan instrument storeroom for retrieval, as per the standard process for the collection of devices. Despite Stryker making arrangements for the Kit’s collection, it could not be located in the relevant storeroom. Stryker worked with the hospital in searching for the Kit and following several attempts at locating the Kit and investigating its potential whereabouts, it remained unaccounted for.

III. Quality control of the Distal Targeting System The following concern was raised: There is no quality control in place in relation to the examination of jigs being used (other than when it is assembled in theatre by a nurse) prior to surgery. There is no auditing/spot checks in relation to the integrity of the jigs. Stryker’s response: Stryker confirms all devices and instrumentation undergo vigorous quality control measures during manufacturing to ensure they are free from design, material or manufacturing defects. These stringent quality controls ensure that only compliant products are placed on the market. All instrumentation, including the relevant Targeting Device, is placed with the hospital under a Consignment Agreement. This Agreement explicitly assigns responsibility for appropriate maintenance, handling, inspection, sterilization and storage of the instrumentation to the hospital. This includes pre-use inspections by the operating surgical team. Stryker remains committed to supporting hospital and healthcare professionals by ensuring access to instrumentation in good working condition. However, as outlined in Section I above, the OT, IFU and Maintenance Instructions of the instrument outline the necessity of a functional check before each procedure and indicate that the responsibility for inspecting and verifying the integrity of the instrumentation prior to its use lies with the hospital and healthcare professionals using the device. These documents provide clear guidance on necessary

pre-use checks and quality controls, emphasizing that any instrument showing signs of wear or damage must not be used and should be replaced. In this case, according to the feedback received by Stryker when carrying out the investigation, all necessary checks were carried out and no deformation or damage was observed on the relevant Targeting System. Additionally, prior to the revision surgery, a Stryker representative removed the Kit containing the Targeting System and carried out an inspection of the instrumentation, finding no quality or functional issues.

Conclusion Stryker is committed to patient safety and product integrity. The Targeting System is designed and manufactured to withstand repeated use when handled and maintained according to the provided guidelines. The OT, IFU and Maintenance Instructions outline the necessary precautions, handling and inspection procedures to ensure the safe and successful use of the instrument. Stryker acknowledges the concerns raised but does not propose any additional actions at this time. The safeguards in place, as outlined above, provide sufficient risk mitigation. Furthermore, the reported incident rate remains an extremely rare occurrence, with only 12 similar adverse events reported globally since 2013, despite over 2.6 million lag screws being distributed and implanted successfully in that same timeframe. Stryker appreciates the opportunity to review this matter and provide our feedback. We remain open to continued engagement and are committed to upholding the highest standards of medical device safety. Should you have any questions in relation to this letter, do not hesitate to contact me.

Sincerely,

Aman Auluck Associate Manager, PMS Stryker UK, Ireland, and Northern Europe

Stryker House, Hambridge Road Newbury, Berkshire, RG14 5AW Tel: +44 1635 262 476 nby_qara@stryker.com

A Auluck Electronically signed by: A Auluck Reason: I approve this document Date: Mar 31, 2025 14:29 GMT+1

REF35392141 - Stryker Response - PI 3492425 and PI 3492428 Final Audit Report 2025-03-31 Created: 2025-03-31 By: A Auluck (Aman.Auluck@stryker.com) Status: Signed Transaction ID: CBJCHBCAABAAhBe7Wlld4mzOS75FSNIXCI638-PYa2db "REF35392141 - Stryker Response - PI 3492425 and PI 349242 8" History Document created by Aman Auluck (Aman.Auluck@stryker.com) 2025-03-31 - 1:28:27 PM GMT- IP address: 176.25.79.12 Aman Auluck (Aman.Auluck@stryker.com) authenticated with Adobe Acrobat Sign. Challenge: The user opened the agreement. 2025-03-31 - 1:29:08 PM GMT Signer Aman Auluck (Aman.Auluck@stryker.com) entered name at signing as A Auluck 2025-03-31 - 1:29:45 PM GMT- IP address: 176.25.79.12 A Auluck (Aman.Auluck@stryker.com) authenticated with Adobe Acrobat Sign. Challenge: The user completed the signing ceremony. 2025-03-31 - 1:29:46 PM GMT Document e-signed by A Auluck (Aman.Auluck@stryker.com) Signing reason: I approve this document Signature Date: 2025-03-31 - 1:29:47 PM GMT - Time Source: server- IP address: 176.25.79.12 Agreement completed. 2025-03-31 - 1:29:47 PM GMT
British Orthopaedic Association
10 Apr 2025
Action Planned
The BOA has drafted generic advice for trauma and orthopaedic surgeons on the need for vigilance regarding the condition and preparation of any jig used, and adherence to operative technique documentation. It also plans to draft guidance as to the number and orientation of intraoperative imaging and post-operative ‘check’ X-rays, with publication expected by the end of May. (AI summary)
View full response
Dear Mr Middleton, Re. Reginald Victor Smith - Prevention of Future Deaths Report (ref: 35392141) Thank you for granting the British Orthopaedic Association (BOA) an extension to respond to the Regulation 28 Report concerning the death of Reginal Victor Smith (date of birth 11th June
1933). Much of the delay in responding has been due to obtaining and viewing the X-rays available. The scope of the information contained within the Regulation 28 Report and the available imaging is not sufficient to review the procedure carried out by the surgeon. We note the matters of concern raised in the Report on the evidence received by the inquest suggest there were two probable reasons for the hip screw not correctly passing into the nail:  firstly, before the femoral nail and jig were inserted it may be that the jig was loose and needed tightening or  secondly, the jig used might have been slightly bent We also note the specific concerns raised that:
1. Each jig is used many times in surgery having been sterilised after each procedure. It is hammered into the thigh bone and on this occasion may have become deformed over time.
2. The jig was sent away to the manufacturer for analysis but was lost and so no information was available to the court in relation to its integrity.
3. There is no quality control in place in relation to the examination of the jigs being used (other than when it is assembled in theatre by a nurse) prior to surgery. There is no auditing/ spot checks in relation to the integrity of the jigs. All implants are supplied with an accompanying document setting out the recommended operative technique. The document offers guidance that the surgeon should heed but, as with any such technical guide, each surgeon must consider the particular needs of each patient and make appropriate adjustments when and as required.

The BOA has drafted generic advice for trauma and orthopaedic surgeons on the need for vigilance as to the condition and preparation of any jig used, as well as adherence to the operative technique documentation accompanying each implant. This draft guidance is currently being reviewed by the BOA and pertinent sub-specialty societies before being published. The BOA will of course send you a copy. It is envisaged that the guidance will be ready for publication by the end of May. The BOA will also draft guidance as to the number and orientation of intraoperative imaging and post-operative ‘check’ X-rays. Once again, the BOA will of course send you a copy upon publication. It is envisaged that this guidance too will be available by the end of May. Do please contact me should you require any additional information.
Sent To
  • Stryker (UK) Ltd
  • British Orthopaedic Association
Response Status
Linked responses 2 of 2
56-Day Deadline 18 Mar 2025
All responses received
About PFD responses

Organisations named in PFD reports must respond within 56 days explaining what actions they are taking.

Source: Courts and Tribunals Judiciary

Report Sections
Investigation and Inquest
On the 14th December 2023, an investigation was commenced into the death of Reginal Victor Smith, born on the 11th June 1933. The investigation concluded at the end of the Inquest on the 10th January 2025. The Medical Cause of Death was: 1a Hypovolemic Shock 1b Re operation of fractured neck of femur 1c Fractured neck of femur II The conclusion of the Inquest recorded that Reginald Victor Smith died as a consequence of a rare but recognised complication of a surgical procedure.
Circumstances of the Death
On 9/10/23 Mr Smith had a witnessed fall at his care home. He was admitted to Poole Hospital where he underwent surgery to repair a right extra capsular neck of femur fracture on 12/10/23. The surgery involved Mr Smith being laid on a traction table and a jig was used to align the fracture for screws to be inserted into a titanium nail which is placed into the femur. On 24/10/23 he was discharged from hospital. On 5/12/23 he attended Poole Hospital for a review appointment when X rays disclosed a failure of metalwork inserted on 12/10/23 and he was readmitted to hospital. On 7/12/23 Mr Smith underwent revision surgery. It was apparent that the hip screw was slightly off centre and being approximately 1mm-2mm off centre did not make proper contact with the nail. Following surgery his health deteriorated. Mr Smith received palliative care and he died in hospital on 7/12/23.
Related Inquiry Recommendations

Public inquiry recommendations addressing similar themes

Robust debrief systems for multi-agency exercises
Manchester Arena Inquiry
No open learning culture Major project lessons learned
National systems to record lessons from exercises
Manchester Arena Inquiry
No open learning culture Major project lessons learned
Obtain comprehensive accounts from commanders
Manchester Arena Inquiry
No open learning culture Major project lessons learned
Address BTP systemic failings from Volume 1
Manchester Arena Inquiry
No open learning culture Major project lessons learned
Review international practice on medics with firearms officers
Manchester Arena Inquiry
No open learning culture Major project lessons learned
LRF oversight of lessons from exercises and incidents
Manchester Arena Inquiry
No open learning culture Major project lessons learned
Establish a managed safety programme to implement inquiry recommendations
Fennell Inquiry
No open learning culture Major project lessons learned
Uniform policy for obtaining technical advice
Scottish Hospitals Inquiry
Major project lessons learned
Standard form for derogations from guidance
Scottish Hospitals Inquiry
No open learning culture
Streamlining NHS construction quality procedures
Scottish Hospitals Inquiry
Major project lessons learned

Data sourced from Courts and Tribunals Judiciary under the Open Government Licence.