TAYL-F32 Response Historic AI-assessed

Inspect and measure turnstile flow rates; ensure regular maintenance

Recommendation

Each turnstile should be inspected and its potential rate of flow measured (if this has not already been done following the Interim Report). Thereafter, regular inspections should be made to ensure that each turnstile remains capable of admitting spectators at the rate anticipated.

Published Evidence Summary
The following publicly available evidence relates to this recommendation:
No specific, recommendation-level evidence of action or government response was found in the provided public sources for this recommendation from the Taylor Inquiry, which concluded in 1990. The available evidence consists of general search results on gov.uk and legislation.gov.uk, which do not contain specific documents detailing the inspection and maintenance of turnstile flow rates.
How was this assessed?
Assessed by gemini-2.5-flash on 24 Mar 2026
Checked data held on this site (government responses, progress updates, independent evidence)
External sources searched: www.gov.uk, www.legislation.gov.uk, hansard.parliament.uk
This recommendation requires implementation across many organisations. The assessment reflects central policy response, not adoption in individual organisations.
Jurisdiction
UK-wide
Response
Historic

No government response recorded.

Source
Report Taylor Inquiry — Final Report 29 Jan 1990
Recommendation age 36.1 yrs
Last formal update No formal updates