2015

PFD Reports
Reports: 477 Areas: 69

61% response rate (below 62% average).

477 results
Margaret Pegnall
Unknown
31 Dec 2015 Norfolk
Concerns summary A GP practice had a vague domestic abuse flowchart focused on depression, lacked a specific domestic abuse questionnaire, and had no system for escalating urgent patient calls.
Mollie Bentham
Unknown
30 Dec 2015 Manchester (West)
Concerns summary Repeated family concerns about abdominal pain and rising infection markers were not documented, escalated to medical teams, or examined, leading to a significant delay in diagnosing a critical condition.
Imran Douglas
All Responded
2015-0446-wp25096 29 Dec 2015 London Inner (South)
General Medical Council London Borough of Tower Hamlets National Offender Management Service
Christopher Higgins
All Responded
2015-0480 24 Dec 2015 Norfolk
James Paget University Hospital Norfolk and Norwich University Hospital Norfolk and Suffolk NHS Foundation Trust +1 more
Concerns summary Inconsistent mental health observation practices, inadequate patient escort protocols during police transfers, unassessed safety risks in the environment, and poor inter-agency agreements for A&E assessment of detained patients led to unsafe conditions.
Angela Brealey
Partially Responded
2015-0473 24 Dec 2015 Staffordshire (South)
South Staffordshire and Shropshire NHS … St George’s Hospital
Concerns summary The trust lacked clear procedures for handling third-party information, showed minimal multidisciplinary team involvement in patient care, and its serious incident review process failed to identify several treatment concerns.
Shalini Ganesh-Ram
Historic (No Identified Response)
2016-0117 22 Dec 2015 London Inner (North)
Royal London Hospital
Concerns summary Delayed diagnosis of a caecum perforation due to multiple systemic failures, including overlooked warning signs, delayed CT scans, inadequate interpretation of radiology findings, and improper use of early warning scores for sepsis.
Mary Hollands
Unknown
21 Dec 2015 North Wales (East and Central)
Concerns summary The system for providing radiologist reports to the Emergency Department is unreliable, creating a risk that subtle injuries may be missed and patient safety netting is ineffective.
Kay Sheard
Unknown
21 Dec 2015 North Wales (East and Central)
Concerns summary Pulse oximeter alarm settings are fixed at a routine level rather than being adjusted to individual patient baselines, risking unnoticed significant oxygen desaturation.
Edna Cleaton
Unknown
17 Dec 2015 Birmingham and Solihull
Concerns summary The practice lacked systems for regular medical reviews of patients on citalopram, resulting in a three-year delay in review and a missed opportunity to identify deterioration.
James Graham
Unknown
17 Dec 2015 County Durham
Concerns summary Critical communication failures between primary care and podiatry, coupled with a lack of ownership in referral processes and administrative errors, caused significant delays in secondary care access.
William Driscoll
Unknown
16 Dec 2015 Birmingham and Solihull
Concerns summary There are serious deficiencies in the medical assessment process for drivers, including insufficient investigation of health conditions, leading to inadequately assessed individuals being permitted to drive.
Kamrul Rubel
Unknown
15 Dec 2015 Birmingham and Solihull
Concerns summary The gym did not enforce the use of the emergency stop cord despite providing advice, raising concerns about adherence to safety protocols for gym equipment.
Ruth Smith
Unknown
15 Dec 2015 West Yorkshire (West)
Concerns summary There were significant delays in doctor review, inadequate nursing observations, and poor record-keeping by both nursing and medical staff. Crucial follow-up for medical interventions was also absent.
Joyce Tozer
Unknown
15 Dec 2015 Birmingham and Solihull
Concerns summary Omnipaque is frequently administered at doses exceeding manufacturer's guidelines, sometimes via central lines, which exposes interventional radiology patients to potential toxicity risks.
Derek Thomas
All Responded
2015-0502 15 Dec 2015 County Durham and Darlington
G4S GEOAmey HMP Durham +1 more
Concerns summary Prison reception procedures failed under extreme pressure, leading to suicide risk information being overlooked due to staffing issues. Additionally, there was poor communication and conflicting understanding between prison and escort staff regarding critical safety form procedures.
William Maskell
Unknown
14 Dec 2015 Exeter and Greater Devon
Concerns summary The absence of clear protocols and an overemphasis on student autonomy led to delayed intervention and reluctance to force entry for a student in distress, risking future deaths.
Paul Whitehead
Unknown
14 Dec 2015 West Yorkshire (East)
Concerns summary Emergency response procedures were inefficient, with delays in contacting emergency services, inadequate first aid provision, and difficulties for paramedics locating the casualty on-site.
Daniel Byrne
Unknown
14 Dec 2015 Milton Keynes
Concerns summary There were repeated failures to identify and assess suicide risk in newly arrived prisoners, with nursing staff notably absent from initial health screenings and reviews.
Alan Walker
Unknown
14 Dec 2015 North Wales (East and Central)
Concerns summary Critical information was not consistently recorded in nursing notes, and handovers did not reference these records, risking significant patient details being missed by incoming staff.
Kevin Gilbert
Unknown
14 Dec 2015 Kent (Central and South East)
Concerns summary There was confusion and unreasonable delay in transferring an acute aortic dissection patient to a tertiary center, including a failure to escalate the transfer decision to a consultant.
Julie Rose
Unknown
14 Dec 2015 Kent (Central and South East)
Concerns summary The "Unable to Make Contact Protocol" lacks clarity on mandatory police welfare checks for high-risk patients, and staff demonstrated inadequate understanding of its procedures.
Margaret O’Brien
Unknown
11 Dec 2015 London (West)
Concerns summary Staff lacked specific, prescribed training on how to properly conduct and record observations of residents.
Ololade Olaobaju
Unknown
10 Dec 2015 London Inner (South)
Concerns summary There is no joint guidance for "Can't Intubate Can't Oxygenate" situations when both anaesthetists and ENT surgeons are present, leading to inconsistent clinical judgments and limited practitioner experience.
Jake Robinson
All Responded
2015-0474 9 Dec 2015 Manchester (South)
Bodmin Road Health Centre Greater Manchester NHS Area Team Greater Manchester West Health NHS Trust
Concerns summary The provided concerns text is incomplete, preventing a proper summary of the identified safety issues.
Madhumita Mandal
Unknown
8 Dec 2015 London (South)
Concerns summary An emergency department streaming model that relied on untrained receptionists without medical observations led to critical delays in patient assessment by qualified healthcare professionals.