Reports & recommendations

93 recommendations, each with the government response on the record. Filter by government response or delivery status.

Title Volume Publication Date Recommendations Links
Hidden Inquiry — Final Report - 07 Nov 1989 93

Recommendations (93)

HIDD-1

BR to rigorously implement cutting, insulating, securing redundant wires before commissioning

Recommendation
BR shall ensure that there is rigorous implementation of the practice of cutting back redundant wires, insulating, and securing them, so that there is no risk of wires coming into contact with working circuitry. Cutting back must be done before …
British Railways Board (Primary)
View details of HIDD-1
HIDD-2

Establish national responsibility for updating and creating new installation standards

Recommendation

BR at national level shall be responsible for updating and creating new standards of installation.

British Railways Board (Primary)
View details of HIDD-2
HIDD-3

Enforce tighter control on Design Office procedures for accurate working drawings

Recommendation
BR shall enforce tighter control on Design Office procedures for the production, issue and amendment of documents to ensure that all working drawings are complete and are an accurate representation of the system to be worked on and of the …
British Railways Board (Primary)
View details of HIDD-3
HIDD-4

Urgently ensure and document independent wire counts during testing procedures

Recommendation
BR shall urgently ensure that an independent wire count is carried out as a matter of practice during testing. It shall be the responsibility of the person in overall charge of testing to ensure and to document that an independent …
British Railways Board (Primary)
View details of HIDD-4
HIDD-5

Identify single individual responsible for overall charge of all testing

Recommendation

BR shall ensure that one individual is always identified as the person in overall charge of testing.

British Railways Board (Primary)
View details of HIDD-5
HIDD-6

Ensure a comprehensive testing plan is drawn up for every commissioning

Recommendation

BR shall ensure that a testing plan is drawn up for every commissioning.

British Railways Board (Primary)
View details of HIDD-6
HIDD-7

Require BR to include sufficient, qualified staff in all testing plans

Recommendation

BR shall ensure that sufficient numbers of suitably qualified staff are included in the testing plan.

British Railways Board (Primary)
View details of HIDD-7
HIDD-8

Require BR to provide and monitor full documentation for proper testing

Recommendation

BR shall ensure that full documentation is provided and later monitored in order that proper testing is carried out.

British Railways Board (Primary)
View details of HIDD-8
HIDD-9

Introduce national testing instruction with workforce explanation, monitoring, and auditing

Recommendation

BR shall introduce a national testing instruction with all speed. Such introduction shall be accompanied by a full explanation to the workforce, including workshops or seminars as necessary. Implementation must be monitored and audited.

British Railways Board (Primary)
View details of HIDD-9
HIDD-10

BR to audit resources and authority for national signal testing instruction implementation

Recommendation

BR shall ensure through its system of audit that the necessary resources and authority are available to Regional Signal Engineers to implement the national testing instruction.

British Railways Board (Primary)
View details of HIDD-10
HIDD-11

Ensure independence of testing and commissioning engineers from new works staff

Recommendation

BR shall ensure that the Testing & Commissioning Engineer must be independent of the line of command between Area Signalling Engineer and new works staff, but able to call on new works staff to assist him in his testing duties.

British Railways Board (Primary)
View details of HIDD-11
HIDD-12

Establish effective systems for personal distribution of departmental instructions to all employees

Recommendation

BR shall ensure that there are effective systems for distributing Departmental Instructions on a personal basis to all relevant employees and that provision is made for the situation where an employee moves to a new post.

British Railways Board (Primary)
View details of HIDD-12
HIDD-13

Require staff to understand, re-read, and biennially confirm understanding of instructions

Recommendation
BR shall ensure, as a matter of practice, that all staff understand and regularly re-read the Departmental Instructions relevant to their posts. In addition, every two years, those staff involved in an annual appraisal interview, shall sign a statement to …
British Railways Board (Primary)
View details of HIDD-13
HIDD-14

Provide necessary technical training for all staff to ensure safe practices

Recommendation

BR shall give technical training as necessary to ensure that efficient and safe practices are carried out by all technical staff.

British Railways Board (Primary)
View details of HIDD-14
HIDD-15

Provide mandatory refresher courses for installers at least every five years

Recommendation

BR shall provide refresher courses for installers at intervals of not more than five years.

British Railways Board (Primary)
View details of HIDD-15
HIDD-16

Urgently progress and monitor training, certification, and refresher courses for testers

Recommendation

BR shall urgently progress and monitor training and certification of testers. Refresher courses shall be evolved.

British Railways Board (Primary)
View details of HIDD-16
HIDD-17

Regularly review the structure and content of all training courses

Recommendation

BR shall ensure that the structure and content of courses are regularly reviewed.

British Railways Board (Primary)
View details of HIDD-17
HIDD-18

Monitor staff overtime to prevent individuals working excessive levels

Recommendation

BR shall ensure that overtime is monitored so that no individual is working excessive levels of overtime.

British Railways Board (Primary)
View details of HIDD-18
HIDD-19

Introduce scheduled hours for Signals and Telecommunications weekend work with unions

Recommendation

BR, in conjunction with the Unions, shall introduce the concept of scheduled hours within the Signals and Telecommunications Department in order to make better provision for work which has to be carried out at weekends.

British Railways Board (Primary)
View details of HIDD-19
HIDD-20

Monitor and forecast skilled S&T staff to ensure safe recruitment and retention

Recommendation

BR shall monitor and forecast wastage and recruitment of skilled S&T staff and take urgent steps to ensure that sufficient numbers of skilled staff are retained and recruited to match work requirements safely.

British Railways Board (Primary)
View details of HIDD-20
HIDD-21

Consider recruiting staff at assistant technician level and above

Recommendation

BR, in reviewing recruitment and retention levels, shall also consider recruiting staff at levels at and above assistant technician.

British Railways Board (Primary)
View details of HIDD-21
HIDD-22

Provide clear job descriptions for all staff grades and posts

Recommendation

BR shall provide all grades with job descriptions for their particular post so that staff know what is expected of them

British Railways Board (Primary)
View details of HIDD-22
HIDD-23

Extend simplified annual appraisal system to include senior technician level

Recommendation

The annual appraisal system, albeit in a simplified form, shall be extended to senior technician level.

HIDD-24

Establish continuous system to identify employees who would benefit from additional training

Recommendation

BR shall ensure that there is an effective system in place on a continuous basis to identify which employees would benefit from additional training.

British Railways Board (Primary)
View details of HIDD-24
HIDD-25

Introduce system for reporting, classifying, and monitoring all WSFs to Board level

Recommendation

BR shall introduce, within S&T Departments, a system of reporting and reviewing all WSFs and shall ensure that they are classified according to potential for danger, and that they are monitored up to and including Board level.

British Railways Board (Primary)
View details of HIDD-25
HIDD-26

Thoroughly investigate unprotected WSFs with danger potential to learn wider lessons

Recommendation

BR shall ensure that any unprotected WSF with potential for danger shall be thoroughly investigated with a view to learning and acting upon wider lessons.

British Railways Board (Primary)
View details of HIDD-26
HIDD-27

Report unprotected WSFs as "dangerous occurrences" to the Railway Inspectorate

Recommendation

Unprotected WSFs shall be reportable to the Railway Inspectorate as a "dangerous occurrence" and reported on by the Chief Inspecting Officer in his annual report.

HIDD-28

Government to seek legislative effect for recommendation 27

Recommendation

Government shall seek to give legislative effect to recommendation 27.

HIDD-29

Person in overall charge of new works to nominate a Project Manager

Recommendation
BR shall ensure that new works schemes in future shall have one clearly identified person in overall charge of all aspects of the project who would nominate a Project Manager from within his chain of command. For predominantly signalling schemes …
British Railways Board (Primary)
View details of HIDD-29
HIDD-30

Project Manager responsible for the whole project within budget and timescale

Recommendation
The Project Manager nominated in 29 above shall be responsible for the execution within budget and timescale of the whole project from the original estimate preparation to the project completion. He shall report to the person in overall charge as …
British Railways Board (Primary)
View details of HIDD-30
HIDD-31

Require external work to be contractual, specified by Project Manager

Recommendation

BR shall ensure that where work is required from areas outside the command of the person in overall charge, that work should be carried out on a contractual basis to a specification provided by the Project Manager.

British Railways Board (Primary)
View details of HIDD-31
HIDD-32

Establish direct reporting line for Testing Engineer to overall scheme charge

Recommendation

BR shall ensure that the Testing Engineer shall be ultimately responsible to the person in overall charge of the scheme, but not through the Project Manager.

British Railways Board (Primary)
View details of HIDD-32
HIDD-33

Provide necessary training resources for wider management down to supervisor level

Recommendation

BR shall make available necessary training resources for wider management training down to supervisor level.

British Railways Board (Primary)
View details of HIDD-33
HIDD-34

Require future reorganisations to be properly planned, resourced, and timely implemented

Recommendation

BR shall require that any future reorganisation shall be properly planned, effectively resourced and implemented to an agreed timetable which takes account of all relevant problems.

British Railways Board (Primary)
View details of HIDD-34
HIDD-35

Implement improved procedures to prevent unallocated staff during reorganisations

Recommendation

BR shall implement improved procedures to replace the cumbersome arrangements on reorganisations which allow staff to be displaced and to remain unallocated.

British Railways Board (Primary)
View details of HIDD-35
HIDD-36

Continue implementing Total Quality Management Initiative and BS5750 quality systems

Recommendation

BR shall continue to press ahead with its Total Quality Management Initiative and the application of British Standard BS5750: Quality systems.

British Railways Board (Primary)
View details of HIDD-36
HIDD-37

Urgently implement the Board's existing quality plan within S&T Departments

Recommendation

S&T Departments shall implement the Board's existing quality plan with the greatest urgency.

HIDD-38

Urgently use outside consultants to review safety management and communication issues

Recommendation
The Court endorses the use of outside consultants to review safety management issues within BR and recommends that the consultants proceed with their programme with the greatest urgency looking particularly at problems of communication up and down the organisation.
HIDD-39

Urgently introduce independent monitoring and auditing for all safety-related work

Recommendation

BR shall introduce monitoring and independent auditing systems in all safety-related aspects of work, in particular the S&T Departments, with the greatest urgency, in advance of Total Quality Management as an aid to good management.

British Railways Board (Primary)
View details of HIDD-39
HIDD-40

Prioritise introduction of on-train data recorders for incident investigation assistance

Recommendation

BR shall give a higher priority to the introduction of on-train data recorders to assist investigation of any future incident.

British Railways Board (Primary)
View details of HIDD-40
HIDD-41

Utilise on-train data recorder information for systematic safety monitoring procedures

Recommendation

BR shall consider the use of information from on-train data recorders as part of a systematic safety monitoring procedure.

British Railways Board (Primary)
View details of HIDD-41
HIDD-42

Report 6-monthly to Railway Inspectorate on accident follow-up and recommendations

Recommendation

BR shall report at 6 monthly intervals to the Railway Inspectorate on its follow-up to the Clapham Junction accident and implementation of its own and this Report's recommendations.

British Railways Board (Primary)
View details of HIDD-42
HIDD-43

Prioritise installation of driver-signalman radio communication on all traction units

Recommendation
BR shall implement as a priority its programme to install a system of radio communication between driver and signalman on all traction units. The introduction of this system shall be in addition to signal-post telephones and not automatically entail their …
British Railways Board (Primary)
View details of HIDD-43
HIDD-44

Install voice recorders to provide a record of all radio messages

Recommendation

BR shall instal voice recorders for the purpose of providing a record of all radio messages relayed.

British Railways Board (Primary)
View details of HIDD-44
HIDD-45

Government allocate sufficient radio frequencies for important safety communication functions

Recommendation

Government, in discussion with BR, shall allocate a sufficient number of frequencies for this important safety function

HIDD-46

Fully implement Automatic Train Protection within five years, prioritising busy lines

Recommendation
The Court welcomes BR's commitment to introduce Automatic Train Protection on a large percentage of its network, but is concerned at the timetable proposed. After the specific type of ATP system has been selected, ATP shall be fully implemented within …
HIDD-47

Report 6-monthly to Railway Inspectorate on Automatic Train Protection implementation progress

Recommendation

BR shall report at 6 monthly intervals to the Railway Inspectorate on its progress in implementing ATP.

British Railways Board (Primary)
View details of HIDD-47
HIDD-48

Study appraisal procedures for safety elements in railway investment proposals

Recommendation

The Department of Transport and BRB shall make a thorough study of appraisal procedure for safety elements of investment proposals so that the cost-effectiveness of safe operation of the railway occupies its proper place in a business-led operation.

HIDD-49

Develop system for allocating project priority to prevent safety compromise

Recommendation

BR shall develop an adequate system of allocating priority to projects to ensure that safety standards are not compromised by delay.

British Railways Board (Primary)
View details of HIDD-49
HIDD-50

Establish organisational framework to prevent commercial considerations compromising railway safety

Recommendation

BR shall ensure that the organisational framework exists to prevent commercial considerations of a business-led railway from compromising safety.

British Railways Board (Primary)
View details of HIDD-50
HIDD-51

Emphasise signalling irregularity definitions and reportable situations during driver training

Recommendation

BR shall ensure that during driver training the definition of a signalling irregularity and situations which are reportable are given greater emphasis.

British Railways Board (Primary)
View details of HIDD-51
HIDD-52

Provide appropriate feedback to drivers reporting signalling irregularities on outcomes

Recommendation

BR shall ensure that drivers, reporting on signalling irregularities, are given appropriate feedback on the outcome.

British Railways Board (Primary)
View details of HIDD-52
HIDD-53

Eliminate re-use of insulation tape and ensure secure insulation methods

Recommendation

BR shall ensure that the practice of the re-use of insulation tape is eliminated and the method of insulation is secure.

British Railways Board (Primary)
View details of HIDD-53
HIDD-54

Complete research programme into structural integrity of rolling stock by April 1991

Recommendation

BR shall carry out its stated programme of research into the structural integrity of its rolling stock within its planned timescale of completion by April 1991.

British Railways Board (Primary)
View details of HIDD-54
HIDD-55

Discuss research conclusions with Inspectorate to agree structural changes for rolling stock

Recommendation

On completion of the programme BR shall discuss its conclusions with the Railway Inspectorate and obtain their agreement to the structural changes necessary to strengthen all relevant rolling stock with a subsequent life span of eight years and over.

British Railways Board (Primary)
View details of HIDD-55
HIDD-56

Extend research to include dynamic testing for improved passenger furniture design

Recommendation

BR shall extend its programme of research to include dynamic testing or full-scale simulations of collision retardations in order to improve the design of internal furniture under conditions of passenger impact.

British Railways Board (Primary)
View details of HIDD-56
HIDD-57

Seek economic dynamic modelling methods for coach collision resistance research

Recommendation

BR shall, as an alternative to full-scale testing, seek economic and practical methods of dynamic modelling during development stages when researching the structural resistance of coaches to collision conditions.

British Railways Board (Primary)
View details of HIDD-57
HIDD-58

Expand involvement in European studies on passenger stock performance and collision resistance

Recommendation

BR shall continue and expand its involvement in collaborative European railway studies of performance of passenger stock, including collision resistance.

British Railways Board (Primary)
View details of HIDD-58
HIDD-59

Amend Road and Rail Traffic Act 1933 to include rolling stock approval

Recommendation

Government shall seek to amend S.41 of the Road and Rail Traffic Act 1933 to clarify what work has to be approved by the Secretary of State after inspection, if necessary, and to include rolling stock within the terms of the statute.

HIDD-60

Achieve and regularly review overall train loading criteria with Department of Transport

Recommendation

BR shall ensure that overall train loading criteria are achieved. The Department of Transport and BR shall keep the criteria under review.

British Railways Board (Primary)
View details of HIDD-60
HIDD-61

Improve inter-service communication for major incident declarations via dedicated lines

Recommendation
The Emergency Services shall improve communication between them to ensure, in particular, that the declaration of a Major Incident by any service is immediately passed by a dedicated phone line to all other services and acted on by them . …
HIDD-62

Conduct regular major incident exercises to test emergency communication systems

Recommendation

Emergency services shall carry out exercises simulating a Major Incident on a regular basis to test specifically their communication systems in the light of the shortcomings identified in Chapter 5.

HIDD-63

Review ambulance procedures to provide early major incident warnings to hospitals

Recommendation

Ambulance services shall review procedures to ensure that the designated and supporting hospitals are given a major incident warning as early as possible.

HIDD-64

Ensure emergency alert lines receive incoming calls only and are tested weekly

Recommendation

Hospitals shall ensure that emergency alert telephone lines receive incoming calls only and are tested weekly. Switchboard operators shall be fully trained in their use and procedure.

HIDD-65

Implement training for Medical Incident Officers in radio communications usage

Recommendation

The LAS shall implement its proposal to train prospective Medical Incident Officers in the use of radio communications.

HIDD-66

Require hospitals to provide Medical Incident Officer training for relevant staff

Recommendation

Hospitals shall provide training in the duties of Medical Incident Officer for staff who could be called upon to act as such in the event of an accident.

HIDD-67

Require emergency services to provide local radio communication at accident sites

Recommendation

Emergency services shall provide local radio communication at the accident site to facilitate liaison between the control units and experts on site.

HIDD-68

Require Ambulance Service to provide hospital aerials for emergency radio communication

Recommendation

The Ambulance Service shall provide aerials at all designated hospitals for radio telephone communication in an emergency. The transmittedreceiver should be provided on declaration of a Major Incident.

HIDD-69

Require all emergency services to provide and ensure personnel wear protective clothing

Recommendation

All emergency services shall ensure that personnel are provided with and wear protective clothing, including protective headgear.

HIDD-70

Require services to provide coloured high-visibility vests for personnel identification

Recommendation

All emergency services, hospitals, BR and local authorities shall provide their personnel with coloured high visibility vests with the name of the service printed on it. Each service shall be easily identified by the colour of its emergency clothing.

British Railways Board (Primary)
View details of HIDD-70
HIDD-71

Require ambulance staff qualified in intubation to wear 'Millar trained' badges

Recommendation

Ambulance services shall require staff properly qualified in intubation and infusion to wear "Millar trained" badges prominently displayed, including on protective clothing.

HIDD-72

Require police casualty bureaux to be equipped with telephone queuing systems

Recommendation

Police forces shall arrange that all casualty bureaux be equipped with a telephone queuing system with a recorded message.

HIDD-73

ACPO to establish system for extending simultaneous casualty bureau call handling

Recommendation

The Association of Chief Police Officers shall continue their efforts to establish an effective system for extending the number of calls which can be dealt with simultaneously by a casualty bureau.

Association of Chief Police Officers (Primary)
View details of HIDD-73
HIDD-74

Require emergency services to recognise Civil Police primacy in non-fire accidents

Recommendation

The emergency services shall recognise the primacy of the Civil Police authority in accidents of this kind where there is no fire. This recognition does not preclude delegation to the LFB of control at trackside.

HIDD-75

Require police forces to adopt Metropolitan Police arrangements for bereaved relatives

Recommendation

Police Forces shall study and follow the excellent arrangements made by the Metropolitan Police for the bereaved and relatives of the seriously injured.

HIDD-76

Require BR and emergency services to maintain joint planning with table-top exercises

Recommendation

In the exercise of command and control at accident sites BR and the emergency services shall maintain their policy of joint planning supported by table-top exercises.

British Railways Board (Primary)
View details of HIDD-76
HIDD-77

Require medical personnel to report to ambulance forward control unit on site

Recommendation

The ambulance service and designated hospitals shall require that all medical personnel report to the forward control unit of the ambulance service on site.

HIDD-78

Require each service to maintain up-to-date staff lists within inner cordon

Recommendation

Each service shall additionally maintain on site an up-to-date list of staff within the inner cordon in case evacuation is necessary.

HIDD-79

Department of Health to review Circular 71, clarifying Major Incident declaration terms

Recommendation
The Department of Health shall review DHSS Circular 71 in consultation with emergency and medical services to reflect all lessons learned but in particular in relation to procedures for declaring a Major Incident. The Department of Health shall specifically require …
HIDD-80

Department of Health to review BASICS' role and funding in emergency planning

Recommendation

In revising the Circular the Department of Health shall consider the role of BASICS in emergency planning and review BASICS' funding arrangements.

HIDD-81

BR to equip signal boxes with direct lines and emergency dialling systems

Recommendation
BR shall complete its programme of equipping major signal boxes with direct lines to the appropriate electrical control and equipping other signal boxes with priority emergency dialling systems. Those direct lines and emergency dialling systems shall be logged and tested …
British Railways Board (Primary)
View details of HIDD-81
HIDD-82

BR to review and test communication systems with emergency services weekly

Recommendation
BR shall review its communication systems with the emergency services to ensure that efficient methods exist to provide and disseminate early information requiring immediate action. In the course of the review BR shall look particularly at communication between signal boxes …
British Railways Board (Primary)
View details of HIDD-82
HIDD-83

BR to ensure proper training and clear instructions for new communication systems

Recommendation
BR shall ensure that those likely to use such systems in recommendations 81 and 82 above shall be properly trained in their use. Instructions in the use of these systems must be clearly drafted, prominently displayed and regularly checked for …
British Railways Board (Primary)
View details of HIDD-83
HIDD-84

Rectify high-priority deficiencies in railway communication systems and signal-post telephones

Recommendation

BR shall ensure that efficient arrangements exist to rectify as a matter of high priority any deficiencies in the communication systems involved in recommendations 81 and 82 and in signal-post telephones.

British Railways Board (Primary)
View details of HIDD-84
HIDD-85

Install public address systems in all new and older trains for passenger communication

Recommendation

BR shall extend its programme of installing public address systems in all new trains and those with a life of over 5 years to allow the driver and/or guard to speak to passengers.

British Railways Board (Primary)
View details of HIDD-85
HIDD-86

Produce updated accident procedure manual and provide staff with appropriate training

Recommendation
BR shall produce an up-to-date manual on Accident Procedure to replace such incomplete and out-of-date documents as the Southern Region Accident Procedure booklet of November 1984. BR shall ensure that all staff are given appropriate training in such procedures.
British Railways Board (Primary)
View details of HIDD-86
HIDD-87

Develop and regularly exercise effective emergency plans for all station staff

Recommendation

BR shall ensure that each area manager, station manager and all senior station staff have an effective emergency plan for their area that is understood by all their staff and is the subject of regular exercises.

British Railways Board (Primary)
View details of HIDD-87
HIDD-88

Introduce emergency signal override in signal boxes and update immobilised train procedures

Recommendation

BR shall introduce into all signal boxes the facility to switch all automatic signals to red in an emergency, and BR shall review and update where necessary its procedures to protect rail traffic in the vicinity of immobilised trains.

British Railways Board (Primary)
View details of HIDD-88
HIDD-89

Examine introducing short-circuiting bars with positive clamp on running rail

Recommendation

BR shall examine the possibility of introducing short-circuiting bars which achieve a positive clamp on the running rail.

British Railways Board (Primary)
View details of HIDD-89
HIDD-90

Detail evidence recording and preservation procedures within the accident procedure manual

Recommendation

BR shall set out in its manual on Accident Procedure the procedures that should be followed to ensure the proper recording and preservation of evidence.

British Railways Board (Primary)
View details of HIDD-90
HIDD-91

Ensure fault finding teams are accompanied by police and photographer for evidence

Recommendation
BR fault finding teams shall report to the Railway Incident Officer who, in consultation with the Police Incident Officer, shall ensure, in all but the most exceptional circumstances, that the team is accompanied by a police officer and a photographer …
British Railways Board (Primary)
View details of HIDD-91
HIDD-92

Promptly update Rule Book and Books of Instruction incorporating report observations

Recommendation

The Rule Book and Books of Instruction of a similar status shall be promptly updated and observations made in this Report taken into account.

HIDD-93

Adequately staff and resource the Railway Inspectorate for increased responsibilities

Recommendation

Government shall ensure that the Railway Inspectorate is adequately staffed and resourced to match the increased responsibilities incurred as a result of recommendations made in this Report.